跳到正文
FDA Pharmaceutical Quality Documents·· 2023-03-13精选AI 评分82

FDA 发布上市后检查合规程序 7356.843,实施日期为 2023 年 3 月 13 日

Postapproval Inspections (7356.843)

AI 导读

FDA 发布合规程序 7356.843,用于对已批准 NDA、ANDA 及其原料药生产设施的上市后检查,实施日期为 2023 年 3 月 13 日,签发日期为 2023 年 1 月 27 日。

推荐理由

文件列出上市后检查的四个产品专属目标,可用于对照工艺验证生命周期、变更管理与数据完整性等核查范围。

正文 · 原文

PDF 文字版;图形和原始排版请参阅官方 PDF。

第 1 页

  FOOD AND DRUG ADMINISTRATION
  COMPLIANCE PROGRAM                                                                      PROGRAM              7356.843


                                   CHAPTER 56—DRUG QUALITY ASSURANCE


        SUBJECT:                                                                             IMPLEMENTATION DATE:
        Postapproval Inspections                                                             03/13/2023

                                                       DATA REPORTING
                   PRODUCT CODES                                    PRODUCT/ASSIGNMENT CODE (PAC)

        Human Drugs                                     PAC        Subject
        Industry Codes:                                 56843 Post-approval Inspections
        50, 54–56, 59, 60–66.                           56R927 Remote Interactive Evaluation (RIE)
                                                               Activities—Human Drugs
                                                        56R928 704a4 Activities—Human Drugs
        Remarks:
        1. ORA should use this compliance program for postapproval inspections of manufacturing
           facilities in support of approved new drug applications (NDAs) and abbreviated new drug
           applications (ANDAs). 1
        2. For reporting biological postapproval inspections, use the PAC 56843 under this compliance
           program (7356.843).
        3. For reporting positron emission tomography (PET) postapproval inspections, use the PAC
           56843 under this compliance program (7356.843).
        4. When postapproval inspection coverage is concurrent with or expanded to provide inspection
            coverage under other compliance programs, follow the appropriate compliance program for
            inspection and report the coverage under separate captions in the establishment inspection
            report (EIR) in accordance with directions provided in the applicable compliance program.

    FIELD REPORTING REQUIREMENTS:

    1. Instructions for Firm Responses
    The investigator instructs the firm’s management to submit Form FDA 483 responses to the
    designated Office of Pharmaceutical Quality Operations (OPQO) division in the Office of Regulatory
    Affairs’ (ORA’s) Office of Medical Products and Tobacco Operations (OMPTO), with a copy to the
    lead investigator. The investigator reviews the postapproval inspection portion of Form FDA 483
    responses and, if inadequate, provides comments to ORA and to the Office of Pharmaceutical
    Manufacturing Assessment (OPMA) in the Center for Drug Evaluation and Research’s (CDER’s)
    Office of Pharmaceutical Quality (OPQ).


    1   In this compliance program, the terms facility, firm, site, and establishment are used synonymously.


Date of Issuance: 01/27/2023                                                                                     Page 1 of 50

第 2 页

                                                                                     PROGRAM               7356.843


    2. Communication of Inspectional Results
    The investigator completes the EIR—which includes the cover sheet, attachments, and exhibits—in
    eNSpect within established ORA time frames. 2 ORA notifies OPMA via the OPMA Postapproval
    Program mailbox ([email protected]) when the EIR is available in an FDA
    electronic repository system.

    3. Facility Alerts
        •   Enter a potential Official Action Indicated (pOAI) alert in Panorama no later than 2 business
            days after the inspection end date if significant current good manufacturing practice (CGMP)
            deficiencies were identified per Part V of compliance program 7356.002—Drug
            Manufacturing Inspections and the deficiencies could potentially impact marketed drug
            products. 3

    4. Inspection Classification

        •   Enter a No Action Indicated (NAI) classification in eNSpect if no deficiencies are noted.

        •   Enter a Voluntary Action Indicated (VAI) classification in eNSpect if deficiencies cited do not
            rise to the level of significance noted in Part V of this compliance program.

        •   Enter an Official Action Indicated (OAI) classification in eNSpect for:

                PAC 56843 when significant deficiencies were identified for the subject drug per Part V
                 of this compliance program. 4

                PAC 56002 when significant CGMP deficiencies were identified per Part V of compliance
                 program 7356.002 and the deficiencies could potentially impact marketed drug products.

    5. Firm Profile Class Code Update
    Do not update the profile class unless at least one of the following applies:
        •   The drug product or active pharmaceutical ingredient (API) under inspection is the only drug
            product or API manufactured under that profile.



    2 See the ConOps agreement Integration of FDA Facility Evaluation and Inspection Program for Human Drugs: A
    Concept of Operations, section 3.3, Communicating the Findings of the Inspection.
    3
      In rare cases, if significant CGMP deficiencies observed for the subject drug under Part V of this compliance program
    (7356.843) could potentially impact other marketed drugs but inspectional coverage was not expanded to compliance
    program 7356.002, a pOAI alert in Panorama should be entered no later than 2 business days after the inspection end date,
    as appropriate, in consultation with the ORA preapproval program manager. For conditions that recommend addition of
    coverage under compliance program 7356.002, see also Part II.3.E—Expanding Inspection Coverage to Compliance
    Program 7356.002.
    4
      Significant deficiencies can include CGMP deficiencies and application-related issues, which are further described in
    Part V of this compliance program.


Date of Issuance: 01/27/2023                                                                                   Page 2 of 50

第 3 页

                                                                        PROGRAM            7356.843


        •   Surveillance coverage (compliance program 7356.002) is added to the postapproval
            inspection.
    For inspections that are deemed acceptable following ORA’s review (i.e., NAI or VAI for PAC
    56843), ORA updates and finalizes PAC statuses and profiles, as appropriate, in eNSpect.
    For inspections that are found initially unacceptable following ORA’s review (i.e., initially OAI for
    PAC 56843), ORA enters the initial PAC status and profiles, as appropriate, in eNSpect and forwards
    to the lead CDER office, as described in Part V, for final review, classification, issuance of an FMD-
    145 letter, and modification in eNSpect.

    6. Sample-Related Reporting Requirements
    The designated analytical servicing laboratory in ORA’s Office of Regulatory Science (ORS) uploads
    completed analytical worksheets to Compliance Management Services (CMS) and submits the
    original worksheet package to the ORA home district office of the manufacturing facility.




Date of Issuance: 01/27/2023                                                                   Page 3 of 50

第 4 页

                                                                                                           PROGRAM                      7356.843


                                                                      CONTENTS

    PART I—BACKGROUND .................................................................................................................... 6
    PART II—IMPLEMENTATION ........................................................................................................... 9
      1.   Scope ............................................................................................................................................ 9
      2.   Strategy ........................................................................................................................................ 9
        A.     Risk-Based Determination for Postapproval Inspections ..................................................... 9
        B.     Inspection by Objective ...................................................................................................... 10
      3. Program Management Instructions ............................................................................................ 11
        A.     Facility Selection ................................................................................................................ 11
        B.     Postapproval Inspection Assignment Requests .................................................................. 11
        C.     Inspection Scheduling and Preparation ............................................................................... 12
        D.     Inspection Team .................................................................................................................. 13
        E.     Expanding Inspection Coverage to Compliance Program 7356.002 .................................. 13
        F.     CDER Consultation During Inspection .............................................................................. 13
        G.     Refusals ............................................................................................................................... 14
      4. Importance of Application Assessment Integration ................................................................... 14
    PART III―INSPECTIONAL ............................................................................................................... 15
      1.  Inspection/Audit Strategy .......................................................................................................... 15
      2.  Inspection/Audit Coverage, Objectives, and Techniques .......................................................... 15
        A.    Objective 1: Process Validation Lifecycle and State of Control ........................................ 16
        B.    Objective 2: Investigations and CAPA Program ................................................................ 22
        C.    Objective 3: Change Management, Change Effectiveness, and Conformance to the
        Application and Other Postmarketing Reports and Requirements ................................................ 24
        D.    Objective 4: Integrity of Product Quality Data ................................................................... 33
      3. Inspection Reporting .................................................................................................................. 35
        A.    Issuance of Form FDA 483 ................................................................................................. 35
        B.    Completion and Assessment of the Establishment Inspection Report................................ 35
      4. Sample Collection or Sample Submission Requests ................................................................. 36
    PART IV—ANALYTICAL ................................................................................................................. 37
    PART V―REGULATORY / ADMINISTRATIVE STRATEGY ...................................................... 38
      1.     Significant Issues ....................................................................................................................... 38
      2.     Coordination for Regulatory/Administrative Follow-Up Actions to Inspection Findings ........ 39
           A.    Issues That Are Considered Significant for PAC 56843 .................................................... 39
           B.    Issues That Are Not Considered Significant for PAC 56843 ............................................. 41
    PART VI—REFERENCES, ATTACHMENT, PROGRAM CONTACTS, AND ACRONYMS ...... 42



Date of Issuance: 01/27/2023                                                                                                                 Page 4 of 50

第 5 页

                                                                                                        PROGRAM                     7356.843


      1.   References .................................................................................................................................. 42
        A.     Code of Federal Regulations, Title 21 ................................................................................ 42
        B.     Compliance Programs ......................................................................................................... 42
        C.     Compliance Policy Guide ................................................................................................... 42
        D.     FDA Guidances................................................................................................................... 43
        E.     Other Procedures and References ....................................................................................... 44
      2. Attachment ................................................................................................................................. 45
      3. Program Contacts ....................................................................................................................... 45
        A.     Office of Regulatory Affairs ............................................................................................... 45
        B.     Center for Drug Evaluation and Research .......................................................................... 46
      4. Acronyms ................................................................................................................................... 46
    PART VII―OVERVIEW OF CDER-ORA RESPONSIBILITIES ..................................................... 48
    ATTACHMENT A: REMOTE REGULATORY ASSESSMENTS .................................................... 49
      1. FDA Records and Other Information Requests Under Section 704(a)(4) of the FD&C Act
      (Statutorily Authorized RRA) ........................................................................................................... 49
      2. Remote Interactive Evaluation (Voluntary RRA)...................................................................... 49




Date of Issuance: 01/27/2023                                                                                                             Page 5 of 50

第 6 页

                                                                                   PROGRAM              7356.843


                                             PART I—BACKGROUND

    The Federal Food, Drug, and Cosmetic Act (FD&C Act) provides that FDA may approve an NDA or
    ANDA if, among other requirements, the methods used in, and the facilities and controls used for,
    the manufacture, processing, packing, and testing of the drug are found adequate to ensure and
    preserve its identity, strength, quality, and purity. 5 In certain circumstances, FDA may approve
    applications without performing an inspection of the facility manufacturing the application product
    (e.g., the facility has a good CGMP compliance history, the application product is not a new profile
    class for the facility, the facility has a successful history with the manufacturing method being
    employed).
    In 2002, FDA announced a significant initiative called Pharmaceutical CGMPs for the 21st Century
    to enhance and modernize the regulation of pharmaceutical manufacturing and product quality. 6 This
    initiative encourages implementation of risk- and science-based approaches that focus FDA attention
    on critical areas to promote better and more consistent decisions among regulators. In accordance
    with the initiative, this postapproval compliance program includes science- and risk-based
    approaches to the inspection of the firm’s manufacturing process, product understanding, and quality
    controls; assurance of quality over the product lifecycle; evaluation of the firm’s manufacturing
    capability; and verification of authenticity of the application data and conformance to approved
    application commitments.
    In 2017, CDER and ORA entered the ConOps agreement Integration of FDA Facility Evaluation
    and Inspection Program for Human Drugs: A Concept of Operations, which outlines the roles and
    responsibilities of CDER and ORA for facility evaluation and preapproval, postapproval,
    surveillance, and for-cause inspections for human drugs. FDA components involved in this
    compliance program—CDER’s OPQ and Office of Compliance (OC), ORA, and FDA
    laboratories—are committed to coordinating efforts and communications to resolve outstanding
    quality issues. This postapproval inspection compliance program aligns with this agreement.
    To facilitate the management of postapproval chemistry, manufacturing, and controls (CMC)
    changes in a more predictable and efficient manner, FDA published the International Council for
    Harmonisation (ICH) guidance for industry Q12 Technical and Regulatory Considerations for
    Pharmaceutical Product Lifecycle Management and its Annexes and the draft guidance for industry
    ICH Q12: Implementation Considerations for FDA-Regulated Products (ICH Q12 implementation
    guidance) in 2021. 7 When used jointly with increased product and process knowledge—and in the
    context of the risk management principles in ICH guidance for industry Q9(R1) Quality Risk
    Management and an effective pharmaceutical quality system (PQS) as described in ICH guidance for
    industry Q10 Pharmaceutical Quality System—these guidance documents should enhance industry’s
    ability to manage CMC changes effectively with less need for extensive regulatory oversight before
    implementation.

    5
      See sections 505(d) and 505(j)(4)(A) of the FD&C Act (21 U.S.C. 355(d)(3) and (j)(4)(A)).
    6
      See Pharmaceutical Quality for the 21st Century—A Risk-Based Approach: Progress Report.
    7
      When final, the ICH Q12 implementation guidance will represent FDA’s current thinking on this topic. For the most
    recent version of a guidance, check the FDA guidance web page at https://www.fda.gov/regulatory-information/search-
    fda-guidance-documents.


Date of Issuance: 01/27/2023                                                                                Page 6 of 50

第 7 页

                                                                                  PROGRAM              7356.843


    For example, any change to an established condition (EC)—legally binding information considered
    necessary to ensure product quality—requires a submission to FDA (PAS, CBE-30, CBE-0, or
    annual report) as detailed in the regulations (e.g., 21 CFR 314.70 and 314.97). 8 Although these
    regulations do not explicitly specify what constitutes an EC, they do set forth a risk-based paradigm
    for reporting changes. In addition, existing FDA guidance documents on postapproval changes
    provide recommendations for how to report a broad set of postapproval changes. 9 ICH Q12 and the
    ICH Q12 implementation guidance provide an opportunity for applicants to specifically define ECs
    and gain clarity around which elements of the product, manufacturing process, facilities and
    equipment, and control strategy in their applications are considered to be ECs and therefore require
    reporting if changed. Proposing ECs in the application is entirely voluntary. If specific ECs are not
    proposed, ECs would be those (e.g., parameters, attributes, controls, specifications, facilities, and
    other elements necessary to ensure product quality) that FDA typically considers to be ECs based on
    the risk-based paradigm set forth in the regulations and the recommendations contained in guidance
    regarding postapproval changes.
    Any ECs identified in an application, and any proposed reporting categories for changes in those
    ECs, are evaluated by the CDER members of the integrated quality assessment (IQA) team. In
    assessing specific ECs and reporting categories, the IQA team will consider areas that may need to
    be covered on a postapproval inspection, such as information about the PQS at establishments where
    the ECs will be implemented as well as the applicant’s scientific justification, which can include
    development studies. For example, an effective PQS as described in ICH Q10 is critical for the use
    of the tools described in ICH Q12. An evaluation of a firm’s change management system, as part of
    the PQS, helps to ensure that there will be appropriate reporting of changes in ECs, including that
    the reporting is consistent with any postapproval change management protocol (PACMP) and the
    product lifecycle management (PLCM) document, if submitted in the application. Under ICH Q12,
    PACMPs are regulatory tools that (1) describe CMC changes the applicant intends to implement
    during the commercial phase of a product’s lifecycle; (2) propose the requirements and studies
    needed to implement product changes; (3) identify specific conditions and acceptance criteria to be
    met; (4) explain how changes would be prepared and verified, including assessment of the impact of
    the proposed change; and (5) suggest reporting categories to notify FDA. FDA refers to PACMPs as
    comparability protocols, which can be submitted independent of any prior identification of ECs in
    the original application or supplement. 10 In all cases, changes are to be appropriately identified and
    implemented in accordance with CGMP requirements.




    8
      PAS=prior approval supplement; CBE=changes being effected.
    9
      See, e.g., FDA’s Scale-Up and Postapproval Changes (SUPAC) guidances and the guidances for industry Changes to
    an Approved Application for Specified Biotechnology and Specified Synthetic Biological Products, Changes to an
    Approved NDA or ANDA, CMC Postapproval Manufacturing Changes To Be Documented in Annual Reports, and
    Comparability Protocols for Postapproval Changes to the Chemistry, Manufacturing, and Controls Information in an
    NDA, ANDA, or BLA.
    10
       Comparability protocols are synonymous with protocols as defined in 21 CFR 314.70(e) and 601.12(e). See guidance
    for industry Comparability Protocols for Postapproval Changes to the Chemistry, Manufacturing, and Controls
    Information in an NDA, ANDA, or BLA.


Date of Issuance: 01/27/2023                                                                                Page 7 of 50

第 8 页

                                                                                        PROGRAM                7356.843


    Further, to facilitate FDA’s initiative to enhance the regulation of pharmaceutical manufacturing and
    product quality, FDA has developed additional tools to augment its regulatory oversight. As a result
    of the Coronavirus Disease 2019 (COVID-19) public health emergency, FDA has relied on various
    alternative tools to advance its regulatory responsibilities. This may include the following: (1)
    requesting existing inspection reports from trusted foreign regulatory partners through mutual
    recognition agreements (MRAs) and other confidentiality agreements; 11 and (2) conducting remote
    regulatory assessments (RRAs), 12 including (a) requesting records and other information directly
    from facilities and other inspected entities related to the application under section 704(a)(4) of the
    FD&C Act, and (b) conducting remote interactive evaluations (RIEs) where appropriate. As
    described further in relevant Agency policies and in this compliance program (including Attachment
    A), FDA may, under certain circumstances, use these tools to evaluate facilities and support
    regulatory decisions on applications.




    11
       For existing FDA MRAs with the European Union and the United Kingdom, this includes the use of official inspection
    reports issued by a recognized authority for manufacturing facilities located inside and outside the territory of the issuing
    authority. For more information, see https://www.fda.gov/international-programs/international-arrangements/mutual-
    recognition-agreement-mra.
    12
       An RRA is an examination of an FDA-regulated establishment and/or its records, conducted entirely remotely, to
    evaluate compliance with applicable FDA requirements. RRAs assist in protecting human health, informing regulatory
    decisions, and verifying certain information submitted to the Agency.


Date of Issuance: 01/27/2023                                                                                        Page 8 of 50

第 9 页

                                                                                      PROGRAM               7356.843


                                            PART II—IMPLEMENTATION

    1. Scope

    ORA and CDER work together under this compliance program to evaluate marketed drug products
    manufactured under approved NDAs or ANDAs or their associated APIs (hereinafter subject
    drugs). 13 Postapproval inspections are similar to preapproval inspections (PAIs) in that they are
    product-specific, but unlike PAIs, they are conducted after applications have been approved.
    Postapproval inspections for subject drugs are led by ORA with optional CDER participation.
    A postapproval inspection focuses on process validation lifecycle, change management, changes
    submitted to the application, and execution of supporting activities per application commitments and
    CGMP requirements. 14
    This compliance program provides risk-based strategies for the scope of inspectional coverage and
    clarifies roles to establish efficient communication.
    CDER uses information from postapproval inspections to update the lifecycle risk profile for a
    subject drug or to determine regulatory action.

    2. Strategy

         A. Risk-Based Determination for Postapproval Inspections

    The IQA team 15 uses a risk-based approach to product quality assessments, which includes facility
    evaluations and, if deemed necessary, inspections of manufacturing facilities listed in the
    application. During the review and approval of a marketing application, the IQA team assesses the
    potential risks concerning product, process, and facility and determines whether a postapproval
    inspection is needed. Such determinations are based on the totality of information that would
    indicate potential facility-relevant risks. In these cases, the ORA preapproval program manager
    (PAM) would consult with OPMA via the OPMA Postapproval Program mailbox
    ([email protected]) to coordinate with the IQA team and confirm that a
    postapproval inspection is needed. In the absence of any potential concern for product quality from
    the IQA team or the ORA PAM based on their risk assessment of the application product, the

    13
       In this compliance program, the terms API and drug substance are synonymous.
    14
       For (a) PET drug products, refer to 21 CFR part 212 and compliance program 7356.002P—Positron Emission
    Tomography (PET) CGMP Drug Process and Pre-approval Inspections/Investigations; (b) drug products, refer to 21
    CFR parts 210 and 211; (c) biological products, refer to 21 CFR parts 210, 211, 600, and 610; (d) APIs in general, refer
    to the recommendations in the ICH guidance for industry Q7 Good Manufacturing Practice Guidance for Active
    Pharmaceutical Ingredients; and (e) APIs labeled as sterile per compliance program 7356.002A—Sterile Drug Process
    Inspections, refer to 21 CFR parts 210 and 211.
    15 For the purpose of this compliance program, the IQA team refers to a designated team of subject matter experts (e.g.,

    drug substance assessor, drug product assessor, biopharmaceutics assessor, manufacturing assessor, ORA preapproval
    program manager or designee as needed) who are assigned to assess quality aspects of application submissions (i.e.,
    original applications or postapproval submissions thereof). It may also include other roles, as needed. See the ConOps
    agreement.


Date of Issuance: 01/27/2023                                                                                     Page 9 of 50

第 10 页

                                                                                    PROGRAM   7356.843


    manufacturing process, and the facility named in the application, a product-specific postapproval
    inspection of a facility may not be needed.
    As appropriate, OPMA will identify additional assignments to those recommended by the IQA team
    based on the combined risk of the product, drug class, and dosage form and based on process and
    facility considerations. The overall purpose of this effort is to confirm that the risk to the patient
    from product quality issues is minimized.
    The need for a postapproval inspection can be determined before, as well as after, application
    approval. For example:
           • Before application approval, the IQA team may anticipate an increased risk of variability in
               product quality during scale up and sustained commercial production and decide that a
               postapproval inspection may be needed, instead of or in addition to a PAI. In these cases,
               either the IQA manufacturing assessment document or the final OPMA recommendation in
               Panorama Inspection View should indicate that a postapproval inspection should be
               performed.
           • In some cases, concerns may arise during a PAI that will need to be addressed by a future
               postapproval inspection.
           • After application approval, OPMA evaluates information from multiple sources in
               developing a list of postapproval inspection candidates. Sources can include completed IQA
               manufacturing assessments, assessments from OPQ’s Office of Quality Surveillance (OQS)
               about the state of pharmaceutical quality at sites (e.g., site dossier), and any changes
               described in postmarket submissions.

           B. Inspection by Objective

    There are four primary product-specific objectives for postapproval inspections, each of which
    requires strategies that consider potential risks and identified concerns:
           1. Objective 1: Process Validation Lifecycle and State of Control
               Verify that there is a high degree of assurance that the commercial manufacturing process is
               in a state of control and consistently produces a subject drug that meets the applicable
               requirements for identity, strength, quality, and purity. 16 Ensure that the firm’s
               manufacturing process, control strategy, test methods, and process performance and product
               quality monitoring system for the subject drug are well-designed, implemented, validated as
               applicable, and verified throughout the product lifecycle as necessary.
           2. Objective 2: Investigations and Corrective Action and Preventive Action (CAPA) Program
               Determine whether investigations and CAPAs associated with the subject drug and
               associated processes and equipment were thoroughly evaluated and effectively implemented
               using quality risk management as an enabler in support of continual improvement.


    16
         See section 501(a)(2)(B) of the FD&C Act and 21 CFR 210.1(a) and 211.100(a).


Date of Issuance: 01/27/2023                                                                    Page 10 of 50

第 11 页

                                                                           PROGRAM            7356.843


        3. Objective 3: Change Management, Change Effectiveness, and Conformance to the
           Application and Other Postmarketing Reports and Requirements
            Determine whether implemented changes in the product, process, components, equipment,
            and/or facility associated with the subject drug were implemented effectively using quality
            risk management as an enabler in support of continual improvement. Verify that the subject
            drug is being manufactured in accordance with the approved application or active drug
            master file (DMF) referenced in the approved application, including filed postapproval
            changes. Confirm that the firm is fulfilling or is on track to fulfill commitments (e.g.,
            providing additional stability data) made at the time of approval (of an original application or
            in subsequent submissions) and is meeting drug quality reporting requirements in a timely
            manner.
        4. Objective 4: Integrity of Product Quality Data
            Audit manufacturing controls, test results, and the related raw data for starting materials, in-
            process materials, and batches of the subject drug. Ensure that the test and production data
            are authentic, computed correctly, accurate, and documented per CGMP and that they
            support the associated decisions by the firm, application submissions, and lifecycle changes.
    For details on inspectional and auditing techniques related to these objectives, refer to Part
    III―Inspectional.

    3. Program Management Instructions

        A. Facility Selection

    OPMA selects a subject drug and associated manufacturing facilities as described in Part II.2.A—
    Risk-Based Determination for Postapproval Inspections. OPMA ensures that the manufacturing
    facility selected for postapproval inspection, including a facility named in a referenced DMF, is still
    named in an approved drug application. OPMA should, to the extent possible, confirm that the drug
    product is marketed using the Electronic Drug Registration and Listing System (eDRLS), Online
    Reporting Analysis Decision Support System (ORADSS), and the OQS site dossier, which may
    contain information useful for this determination.

        B. Postapproval Inspection Assignment Requests

    OPMA issues postapproval inspection assignment requests to the ORA Pharmaceutical Assignment
    mailbox ([email protected]) and the appropriate ORA division manager or
    ORA PAM. OPMA summarizes product and process knowledge from the application and identifies
    and advises on onsite coverage of potential risks to and concerns for product and process, which the
    investigator can use to develop an inspection plan.
    These assignment requests could involve multiple applications for one facility, with different
    degrees of coverage of the four objectives. Reasons for the assignment could include the level of
    manufacturing experience, risk factors that apply to two or more subject drugs, and an efficient use
    of resources by covering multiple applications at one inspection, among others.


Date of Issuance: 01/27/2023                                                                     Page 11 of 50

第 12 页

                                                                          PROGRAM            7356.843


    Postapproval inspection assignments should include the selection rationale, a product risk
    assessment based on the original application and postapproval submissions thereto, and the criteria
    for choosing applications, as necessary.
    OPMA expects postapproval inspection assignments to be covered by ORA field personnel as part of
    ORA’s work plan for the fiscal year. Resources allocated under PAC 56843 are intended for this
    compliance program. ORA notifies OPMA via the OPMA Postapproval Program mailbox
    ([email protected]) if ORA will be unable to complete an assignment
    because of competing priorities.
    ORA may find that the selected application product has not been marketed and may find a more
    suitable application product for postapproval inspection coverage. In these situations, ORA can
    exercise discretion and select a different application for postapproval inspection coverage than that
    assigned. However, ORA should coordinate with OPMA before making any such changes in
    assignment. A postapproval inspection may be combined with other programs or for-cause
    inspections as necessary for efficient inspection coverage. A systems-based CGMP surveillance
    inspection per compliance program 7356.002 may be added as per program management
    instructions. ORA should send concerns, problems, or objections regarding the assignment request to
    the OPMA Postapproval Program mailbox ([email protected]).

        C. Inspection Scheduling and Preparation

    During logistics planning (e.g., determining the inspection start date), and before initiating the
    postapproval inspection, ORA may decide to confirm with the firm that the drug is manufactured at
    the inspection site.
    In addition to following the steps in section 5.5.1.1—Preparation and References—of the
    Investigations Operations Manual (IOM), investigators should prepare for a postapproval inspection
    by conducting the following activities:
        •   Review the completed DMF/drug process/micro IQA reviews and the CMC section of the
            application (including the original development report), related supplements and
            postapproval changes, annual reports, application postapproval commitments, and related
            DMFs associated with the inspection assignment.
            Note: This information can be accessed electronically via Panorama or DARRTS/Lorenz
            docuBridge. Applications often contain trade secrets or confidential commercial information,
            and it is essential that the information be carefully protected to prevent its release outside
            FDA. ORA divisions are expected to establish a controlled access filing system to prevent
            the unauthorized use or release of application information.
        •   Based on the assignment request, contact the drug process, microbiology, and facility
            assessors assigned to the application, as applicable, to discuss special areas for coverage and
            questions regarding the submitted information (e.g., test methods, data tables, raw material
            attributes, justifications for finished product specifications).
        •   Access the application’s most current PLCM document or comparability protocols via an
            OPMA request or docuBridge to ensure inspection coverage is relevant.



Date of Issuance: 01/27/2023                                                                    Page 12 of 50

第 13 页

                                                                                        PROGRAM                7356.843


        •    After reviewing the assignment request and the related PAI’s EIR (if performed), contact
             OPMA with questions about the application and contact the ORA PAM or designee with
             questions about the performed PAI, EIR, and firm history.
        •    In consultation with other inspection team members, develop an inspection plan that is
             specific to the establishment and its compliance history and to the subject drug being
             inspected and is consistent with this compliance program’s objectives and inspectional and
             auditing techniques.

        D. Inspection Team

    ORA leads postapproval inspections and CDER participates with CDER and ORA management
    concurrence. ORA investigators and CDER application assessors or CDER subject matter experts
    are encouraged to jointly participate in postapproval inspections, particularly for those subject drugs
    that are a new molecular entity, incorporate a new molecular entity, are a novel formulation or
    dosage type, are produced using a novel unit operation or processing method, or use a novel
    analytical test method or technique. While the ORA investigator is responsible for reporting
    inspection findings in the EIR, all participants on an inspection team are responsible for submitting
    their portion of the EIR and supporting exhibits to the lead investigator in a timely manner, as
    directed by the lead investigator.

        E. Expanding Inspection Coverage to Compliance Program 7356.002

    The inspection team should add surveillance coverage with PAC 56002 under compliance program
    7356.002 17 if it finds objectionable conditions for the assigned subject drug during the postapproval
    inspection and if one of the following conditions exist:
        •    The subject drug is the only product manufactured at the establishment; or
        •    The objectionable conditions identified for the subject drug as per part V of this compliance
             program could potentially impact other marketed drug products manufactured at the
             establishment.

        F. CDER Consultation During Inspection

    When product-specific issues arise that cannot be immediately resolved by the investigator on-site
    and may need the subject matter expertise of product assessors from CDER (OPQ), ORA can reach
    out to the appropriate OPMA/review division representative for clarification.




    17
       Unless there is an assignment from the current Site Surveillance Inspection List or there is justification based on
    objectionable observations that could impact marketed drug products, surveillance coverage (56002(X)) would not
    typically be added to postapproval inspection assignments.


Date of Issuance: 01/27/2023                                                                                      Page 13 of 50

第 14 页

                                                                                   PROGRAM              7356.843


         G. Refusals

    Under section 501(j) of the FD&C Act, a drug is adulterated that “has been manufactured, processed,
    packed, or held in any factory, warehouse, or establishment and the owner, operator, or agent of such
    factory, warehouse, or establishment delays, denies, or limits an inspection, or refuses to permit
    entry or inspection.” 18

    Investigators should fully document the circumstances of the denial, delay, limitation, or refusal as
    outlined in the IOM. The ORA program division should attempt to resolve the issue, but if initial
    attempts are unsuccessful, the ORA program division should notify its Office of Chief Counsel
    senior enforcement advisor, if needed, and OC for awareness and assistance. In the event a denial,
    delay, limitation, or refusal occurs during an inspection where the circumstances indicate a
    significant threat to humans or animals, the investigator should attempt to collect an inventory of all
    drugs (components and finished products) at the establishment.

    4. Importance of Application Assessment Integration

    Achieving a science-based approval decision about each application from a pharmaceutical quality
    perspective requires an integrated assessment of the application and associated facilities. Because
    this requires input from multiple disciplines in FDA, differences of opinion may occur. FDA offices
    involved in the postapproval inspection program are covered by an equal voice philosophy. Under
    this philosophy, all appropriate expertise should be considered in the important decisions made about
    applications, and the perspective from each FDA office assigned a role in reviewing and evaluating
    drug applications is valuable. This equal voice environment is achieved, in practice, when each
    organizational unit:
         •   Integrates each contribution to enhance the decision of the multidisciplinary team.
         •   Provides an environment where all team members can express their views for the areas in
             which they have a recognized responsibility.
         •   Ensures an avenue for promptly raising unresolved differences of opinion through the
             management chain for prompt resolution.
         •   Maintains transparency with a full and adequate record documenting decisions, including
             significantly differing views.




    18
      See also guidance for industry Circumstances That Constitute Delaying, Denying, Limiting, or Refusing a Drug
    Inspection for additional information.


Date of Issuance: 01/27/2023                                                                               Page 14 of 50

第 15 页

                                                                        PROGRAM            7356.843


                                       PART III―INSPECTIONAL

    1. Inspection/Audit Strategy

    There are four primary product-specific objectives to be covered under this compliance program:
        1. Objective 1: Process Validation Lifecycle and State of Control.
        2. Objective 2: Investigations and CAPA Program.
        3. Objective 3: Change Management, Change Effectiveness, and Conformance to the
           Application and Other Postmarketing Reports and Requirements.
        4. Objective 4: Integrity of Product Quality Data.
    The inspection team should provide the coverage described in the assignment memo as well as
    provide additional, in-depth coverage of potential issues identified during the inspection.

    2. Inspection/Audit Coverage, Objectives, and Techniques

    Subsequent to an application approval, the firm should have generated and collected substantially
    more manufacturing and laboratory data than what is typically provided at filing and made available
    during the application review. Product and process knowledge gained by analysis of such data
    should help firms demonstrate their ability to consistently maintain process controls, meet quality
    specifications, reliably produce subject drugs of intended quality, and adequately respond to
    unexpected or aberrant results in a timely manner to prevent poor quality drug products from
    reaching consumers.
    Postapproval inspection focuses largely on the product lifecycle, including the process validation
    lifecycle and manufacturing changes that may have occurred after approval. During a postapproval
    inspection, the inspection team reviews records and processes for changes related to the subject drug
    that have occurred from the time the application was approved up to the time of the inspection. The
    inspection team should also confirm that manufacturing-related commitments made by applicants
    during the application or supplement approval stage have been completed or are underway. It is not
    uncommon for manufacturers to change production equipment, manufacturing procedures, and
    associated control strategies based on scale-up, process qualification, process verification, and
    capacity needs. Such modifications, which generally need to be submitted for FDA review (see 21
    CFR 314.70) unless otherwise provided for as approved ECs, reflect changes to the approved
    application and must conform to CGMP regulations (see 21 CFR 211.22 and 211.100).
    This section further explains each postapproval inspectional objective and provides examples of
    documents and processes to review, guiding points for inspectional focus areas and coverage, a
    framework for assessing the firm’s performance, and references to applicable regulations and
    guidance documents.




Date of Issuance: 01/27/2023                                                                 Page 15 of 50

第 16 页

                                                                                    PROGRAM              7356.843


         A. Objective 1: Process Validation Lifecycle and State of Control
            Summary: Verify that there is a high degree of assurance that the commercial
            manufacturing process is in a state of control and consistently produces a subject drug
            that meets the applicable requirements for identity, strength, quality, and purity. 19
            Ensure that the firm’s manufacturing process, control strategy, test methods, and
            process performance and product quality monitoring system for the subject drug are
            well-designed, implemented, validated as applicable, and verified throughout the
            product lifecycle as necessary.

    Process validation is defined as the collection and evaluation of data from the process design stage
    through commercial production, which establishes scientific evidence that a process is capable of
    consistently delivering quality product. Process validation is grouped into three stages: (1) process
    design, (2) process qualification, and (3) continued process verification. 20 Process validation
    coverage during postapproval inspection primarily focuses on stages 2 and 3—process qualification
    and continued process verification—for the commercial manufacture of the subject drug. Stage
    1―process design―is expected to require less coverage, particularly for subject drugs for which
    PAIs were conducted. During a postapproval inspection, the investigator may need to evaluate
    certain aspects of process design if they observe variability in commercial manufacturing data (stage
    3 data, e.g., trends, deviations, failures) or process qualification studies and data (stage 2 data).
    Suggested focus areas within the three process validation stages are described below.

         (1) Objective 1A: Review of Process Design (Process Validation—Stage 1)

    Sufficient documentation of process design activities is necessary to ensure that process knowledge
    is appropriately captured, evaluated, and leveraged for use in subsequent stages of process
    validation. Product development activities, including design of experiment (DoE) studies and
    appropriate application of risk analysis tools in particular, are perhaps among the best industry
    practices that manufacturers can use to develop process knowledge.
    Process design and development studies, in particular DoE studies, typically help reveal
    relationships between variable inputs (e.g., component characteristics, process parameters) and
    resulting outputs (e.g., in-process material, intermediates, subject drug). Additionally, process design
    studies (e.g., laboratory or pilot-scale models, computer-based or virtual simulations of certain unit
    operations or process dynamics), and in particular the scale-up studies to commercial production,
    address the functionality and operational limitations of commercial equipment and the anticipated
    contributions to variability posed by different component lots (e.g., impact of component particle
    size on unit operations such as mixing/blending, filling, or compression), production operators,
    environmental conditions, and measurement systems in the production setting. The scientific data
    resulting from process design, including DoE studies, can contribute to process understanding and



    19
      See footnote 16.
    20
      See guidance for industry Process Validation: General Principles and Practices for expectations about the scope and
    purpose of these three stages.


Date of Issuance: 01/27/2023                                                                                 Page 16 of 50

第 17 页

                                                                                    PROGRAM              7356.843


    thereby help manufacturers justify ranges for incoming component quality, equipment parameters,
    in-process material quality attributes, and the design of manufacturing process and controls.
    Inspection Coverage 21
         •   If objective 1A was not previously evaluated (e.g., during a PAI or during an RIE 22 or an
             assessment conducted under section 704(a)(4) of the FD&C Act), or there was a quality
             concern identified from the previous evaluation, review the product development activities,
             experimental reports, and other supportive data and reports available—whether they were
             included in the original application or they were performed as part of a research or trial batch
             on a different manufacturing scale―to determine if the process was designed to produce the
             subject drug meeting the established critical quality attributes before the firm initiated stage 2
             process validation activities.
         •   Determine if the firm appropriately executed relevant process design activities in response to
             deviations observed in stage 2 or 3.

         (2) Objective 1B: Review of Process Performance Qualification (Process Validation—
             Stage 2)

    The focus of postapproval inspections during the process qualification stage is on process
    performance qualification (PPQ), which is primarily concerned with achieving a level of confidence
    that the commercial process and controls consistently result in high-quality product and that
    commercial distribution is justified.
    Firms can achieve this by (1) designing and executing a written protocol (hereinafter PPQ protocol)
    that specifies manufacturing conditions, controls, testing, and expected outcomes, and (2) generating
    a report (hereinafter PPQ report) that documents adherence to the PPQ protocol and draws
    conclusions as to whether the process (a) meets the conditions established in the PPQ protocol and
    (b) is in a state of control. 23
    Inspection Coverage
         •   Verify that the PPQ protocol for the subject drug has been reviewed and approved by
             appropriate departments, including the quality unit, before its execution as per the established
             procedure.
         •   Evaluate the adequacy of the PPQ protocol in terms of the essential elements it describes,
             which may include but are not limited to the following:


    21
       Refer to the original application and IQA for information regarding manufacturing of the drug substance or drug
    product, batch formula and components, unit operations, process development activities, in-process controls and
    specifications, and identified lifecycle considerations.
    22
       For more information on this topic, see guidances for industry Remote Interactive Evaluations of Drug Manufacturing
    and Bioresearch Monitoring Facilities During the COVID-19 Public Health Emergency and Manufacturing, Supply
    Chain, and Drug and Biological Product Inspections During COVID-19 Public Health Emergency: Questions and
    Answers.
    23
       For further details, see guidance for industry Process Validation: General Principles and Practices.


Date of Issuance: 01/27/2023                                                                                 Page 17 of 50

第 18 页

                                                                                   PROGRAM             7356.843


                A reflection of the approved application.
                Primary features and layout of the commercial production facilities.
                Qualifications of utilities, equipment, raw material (including starting materials),
                 components, and personnel.
                Description of manufacturing conditions, identification of relevant quality attributes,
                 including critical quality attributes, along with description of their controls.
                 ­ Acceptance criteria for each significant processing step and for the cumulative
                   process.
                 ­ Identification of the data to be collected and a description of when and how it will be
                   evaluated.
                Limitations for proposed commercial manufacturing conditions, including equipment
                 operating parameters and processing limits.
                Identification and validation status of test methods used for process measurements (e.g.,
                 in-process, release testing).
                A representative sampling plan including sampling points, sampling strategy (frequency
                 and number), and acceptance criteria with an objective to provide sufficient statistical
                 confidence of quality both within a batch and across batches. 24
                Provision for addressing deviations from expected conditions and handling of
                 nonconforming data.
                Documentation of science-based justification if excluding PPQ data from further
                 consideration.
         •   Evaluate the adequacy of the information summarized in the PPQ report, which may include
             but is not limited to the following:
                Summary and analysis of data collected, as specified by the PPQ protocol.
                Evaluation of unexpected observations and additional data not specified in the PPQ
                 protocol.
                Summary and discussion of manufacturing nonconformances such as deviations, aberrant
                 test results, and other information that may have a bearing on the validity of the process.
                Description in sufficient detail of corrective actions or changes that need to be made to
                 existing procedures and controls.
                A conclusion that is based on a compilation of process knowledge and information from
                 the design stage through the process qualification stage and includes the following:

    24
      For FDA’s current thinking regarding sampling for blend uniformity/content uniformity, see
    https://www.fda.gov/Drugs/GuidanceComplianceRegulatoryInformation/Guidances/ucm124782.htm#16 rather than
    relying solely on the requirements of USP General Chapter <905> Uniformity of Dosage Units or EP 2.9.6 Uniformity of
    Content of Single-Dose Preparations without performing additional developmental activities. USP= United States
    Pharmacopeia; EP= European Pharmacopeia.


Date of Issuance: 01/27/2023                                                                               Page 18 of 50

第 19 页

                                                                                    PROGRAM               7356.843


                 ­ Clear establishment of the degree to which PPQ protocol study conditions, acceptance
                   criteria, and process performance indicators for product quality and process
                   consistency have been met, including a description of the control of and justification
                   for changes made to PPQ criteria during the study.
                 ­ Sufficient description of manufacturing conditions or quality attributes identified
                   during the PPQ study that, per a risk analysis, will require either correction or
                   changes to existing procedures and controls.
                 ­ Conclusion as to whether the process is in a state of control. If not, the report should
                   describe the conditions to be met before such a conclusion can be reached.
                Approval of the PPQ report by appropriate department and quality unit personnel.
         •   Determine whether the conclusions on the manufacturing process’ state of control and
             commercial distribution are justified and supported by the information in the PPQ report.
         •   Determine the accuracy and authenticity of the data and calculations generated during
             execution of the PPQ protocol (e.g., raw data including laboratory notebooks, executed batch
             records, internal quality decisions). Evaluate and determine the adequacy of the executed
             PPQ protocol and the final written report, including deviations, results, outcomes, and
             conclusions drawn.
         •   Evaluate the investigation reports for the firm’s resolution of product quality/process control
             issues that arose during the PPQ study (e.g., specifications not met, process controls not
             adequate, variability exceeding acceptance criteria, lots rejected). 25
         •   Evaluate the impact of recent changes to commercial manufacturing facilities, processing
             conditions, or critical quality attributes in the approved application on the validity of the PPQ
             study.
         •   Evaluate whether the equipment and utilities remain suitable for their intended use and
             whether the preventive maintenance program remains appropriate based on information
             collected since PPQ completion.

         (3) Objective 1C: Review of Continued Process Verification (Process Validation—Stage 3)

    Continued process verification provides assurance throughout the lifecycle that the commercial scale
    process remains in a state of control (i.e., the validated state). During continued process verification,
    manufacturers enhance, as necessary, mechanisms for detecting and monitoring signals of process
    drift, shift, or loss of control to identify the source and scope of newly identified variations.
    Manufacturers evaluate the commercial process and product data to identify and prevent
    unacceptable variability. As manufacturers accumulate information during commercial production,


    25
      An unresolved PPQ processing issue may allow for variation in process parameters or in commercial product quality
    that unexpectedly becomes unacceptable. The source of an unresolved PPQ processing issue may be a hitherto
    unidentified process design (stage 1) defect. An unresolved PPQ processing issue may allow for episodic or persistent
    process variation in process parameters or in product quality that is revealed by a careful inspection of commercial
    product data and information (stage 3).


Date of Issuance: 01/27/2023                                                                                 Page 19 of 50

第 20 页

                                                                                       PROGRAM              7356.843


    component variability that was not observed during process design and development (stage 1) or
    PPQ (stage 2) can manifest in the in-process materials and thereby contribute to variability in
    product quality. When variability is detected, manufacturers should investigate and determine if
    process parameter ranges need to be adjusted, process changes are needed to manage the variability,
    or increased sampling is needed to better monitor and understand in-process material attribute
    variability. Changes in operating conditions (e.g., ranges/set-points), process controls, components
    or in-process material attributes/characteristics, and specifications may require additional process
    design or PPQ studies to maintain compliance with 21 CFR 211.180(e) and sections 506A(a)(1) and
    (b) of the FD&C Act.
    Inspection Coverage
           •   Review and evaluate the firm’s quality management oversight and the methods used to assess
               the commercial product data; determine if the firm adequately detects emerging trends
               related to product quality from the information found in product data analysis reports; and
               determine if the firm adequately incorporates risk analysis into decisions regarding continued
               process verification data. This information may be found in:
                   Analysis of nonconforming product data from complaints, product rejections, recalls,
                    NDA/ANDA field alert reports (FARs), adverse event reports, audits, regulatory
                    inspections, and similar sources.
                   Investigations into unexpected trends recognized from the analysis of process, material,
                    or product variability.
                   Process performance and product quality monitoring data, including control charts,
                    process deviations, in-process batch release testing results, process yield variations,
                    nonconformances, and batch records.
                   Documentation of the appropriate statistical process control techniques applied as part of
                    the product and quality improvement program.
                   Laboratory records, including stability data trend analysis and reports, testing deviations,
                    nonconformances, investigations, and CAPA reports 26 with discussions of root cause
                    factors for out-of-trend (OOT) and out-of-specification (OOS) test results for raw
                    materials, in-process materials, and the subject drug.
           •   Determine if the firm adequately considered the need for additional process design or process
               qualification studies when changes are made to the process after the initial PPQ, including
               necessary adjustment of the sampling plan (e.g., frequency, sample size, location) to better
               monitor and understand process variability.
           •   Determine if the firm evaluates production data and leverages such data to identify changes
               needed in the manufacturing process, control procedures, or specifications, thereby
               promoting continual improvement throughout the product lifecycle.




    26
         Refer to objective 2 regarding important elements to be considered for investigations and CAPAs.


Date of Issuance: 01/27/2023                                                                                  Page 20 of 50

第 21 页

                                                                                         PROGRAM   7356.843


           (4) Related Resources

    Regulations
          •    21 CFR 211.22, 211.63, 211.84, 211.100, 211.110, 211.180
    Guidance for Industry
           •   Analytical Procedures and Methods Validation for Drugs and Biologics (July 2015)
           •   Control of Nitrosamine Impurities in Human Drugs, Rev. 1 (February 2021)
           •   Data Integrity and Compliance With Drug CGMP Questions and Answers (December 2018)
           •   Manufacturing, Supply Chain, and Drug and Biological Product Inspections During COVID-
               19 Public Health Emergency: Questions and Answers (May 2021)
           •   Media Fills for Validation of Aseptic Preparations for Positron Emission Tomography (PET)
               Drugs (April 2012)
           •   PET Drugs—Current Good Manufacturing Practice (CGMP) (December 2009)
           •   PET Drugs—Current Good Manufacturing Practice (CGMP), Small Entity Compliance
               Guide (August 2011)
           •   Process Validation: General Principles and Practices (January 2011)
           •   Quality Systems Approach to Pharmaceutical CGMP Regulations (September 2006)
           •   Remote Interactive Evaluations of Drug Manufacturing and Bioresearch Monitoring
               Facilities During the COVID-19 Public Health Emergency (April 2021)
           •   Sterile Drug Products Produced by Aseptic Processing—Current Good Manufacturing
               Practice (October 2004)
    Draft Guidance for Industry 27
          •    ICH Q12: Implementation Considerations for FDA-Regulated Products (May 2021)
    ICH Guidance for Industry
          •    Q7 Good Manufacturing Practice Guidance for Active Pharmaceutical Ingredients
               (September 2016)
          •    Q8(R2) Pharmaceutical Development (November 2009)
          •    Q9(R1) Quality Risk Management, Draft (June 2022)
          •    Q10 Pharmaceutical Quality System (April 2009)
          •    Q12 Technical and Regulatory Considerations for Pharmaceutical Product Lifecycle
               Management (May 2021)



    27
         When final, this guidance will represent the FDA’s current thinking on this topic.


Date of Issuance: 01/27/2023                                                                         Page 21 of 50

第 22 页

                                                                                          PROGRAM                7356.843


         B. Objective 2: Investigations and CAPA Program
             Summary: Determine whether investigations and CAPAs associated with the subject
             drug and associated processes and equipment were thoroughly evaluated and
             effectively implemented using quality risk management as an enabler in support of
             continual improvement.

         (1) Objective 2A: Investigations

    In general, the depth and breadth of investigations of any product- or process-related deviation
    should be governed by a documented risk assessment and should take a structured approach to
    determining the root cause of the deviation.
    The level of effort, formality, and documentation of the investigation should be commensurate with
    the level of risk. The firm should support its conclusions with scientific rationale and data generated
    through investigations. Where applicable, the firm should use retain samples or confirmatory testing
    to aid in its investigations. Laboratory error should be rare and is not sufficient to justify invalidating
    data, unless there is clear evidence that it was the root cause of a failing result.
    The analysis of product risk should be commensurate with the significance and risk of the
    nonconformity and its perceived impact on the quality, safety, or effectiveness of the drug product.
    The firm should conduct the risk assessment in a timely manner, using sound scientific and quality
    risk management principles. This includes consulting subject matter experts from departments within
    the organization with the expertise needed to ensure a full understanding of the scope of the problem
    and its implications for product quality and risk to public health. 28
    Inspection Coverage 29
         •   Review the firm’s response to both internal (e.g., deviation, OOT, OOS, errors) and external
             (e.g., drug quality reports, recalls, complaints) signals for the subject drug. Investigations
             involving released drug product should be given priority.
         •   Ascertain if the firm conducts or has conducted a thorough root cause investigation to
             identify product quality issues for the subject drug.
         •   Determine if the firm’s investigations included an analysis of product risk and an evaluation
             of risk to public health.
         •   Confirm that the firm expanded the scope of the investigation to include any and all lots of
             the subject drug and any other drug products that may have been affected.




    28
       Departments include those involved in pharmaceutical development, manufacturing, quality, technical services,
    laboratory work, materials management, regulatory affairs, and medical services.
    29 During a postapproval inspection, coverage should focus on the investigations and CAPAs pertaining to the subject

    drug rather than on the overall effectiveness or validity of the investigation system itself, which is the typical focus of a
    surveillance-based inspection.


Date of Issuance: 01/27/2023                                                                                        Page 22 of 50

第 23 页

                                                                           PROGRAM            7356.843


        (2) Objective 2B: CAPA Program

    The CAPA program considers the risk that the problem poses to product quality. The level of effort,
    formality, and documentation of CAPAs should be commensurate with the level of risk. The CAPA
    program should also address identified problems, prevent their recurrence, and trigger improvements
    through change management as necessary.
    Inspection Coverage
        •   Based on the firm’s response to internal and external signals for the subject drug, check
            whether the firm has a procedure to prioritize CAPAs based on risk and manage CAPAs for
            the released subject drug in a timely manner. Through this coverage, assess the adequacy of
            the firm’s approach, actions, and responses regarding the following:
                Routine, proactive identification and analysis of quality data regarding product and
                 quality problems.
                Evaluation of deviations, nonconformances, investigations, complaints, Process
                 Performance and Product Quality Monitoring System data/trends, and other external
                 reports to determine an appropriate CAPA.
                Documentation of the full extent of a problem before conducting risk analysis or
                 determining the proper course of a CAPA.
                Application of quality risk management concepts in the CAPA approach.
                Review of proposed CAPAs by a cross-functional team with the necessary training and
                 experience before management approval.
        •   Evaluate the firm’s CAPAs to ensure they were implemented in a timely manner and that
            they are effective and prevent recurrence. Through this coverage, assess the adequacy of the
            firm’s CAPA approach, actions, and responses regarding the following:
                Documentation of effectiveness check criteria (e.g., implementation timeline and
                 milestones, collection of feedback, validations, other evidence of the success of the
                 corrections made).
                Monitoring for recurring deviations.
                Evaluation and mitigation of new or recurring risks derived from the CAPA effectiveness
                 check, with management review and approval.
                Management assurance that responsible parties will follow through on CAPA
                 commitments, including reporting as postapproval changes, as applicable.
                Timely filings of regulatory submissions and postmarketing reports.

        (3) Related Resources

    Regulations
        •   21 CFR 211.22(c), 211.84, 211.100, 211.110(a)



Date of Issuance: 01/27/2023                                                                     Page 23 of 50

第 24 页

                                                                           PROGRAM            7356.843


    Guidance for Industry
        •   Current Good Manufacturing Practice Requirements for Combination Products (January
            2017)
        •   Investigating Out-of-Specification Test Results for Pharmaceutical Production (October
            2006)
        •   Quality Systems Approach to Pharmaceutical CGMP Regulations (September 2006)
    ICH Guidance for Industry
        •   Q9(R1) Quality Risk Management, Draft (June 2022)
        •   Q10 Pharmaceutical Quality System (April 2009)

        C. Objective 3: Change Management, Change Effectiveness, and Conformance to the
           Application and Other Postmarketing Reports and Requirements
            Summary: Determine whether implemented changes in the product, process,
            components, equipment, and/or facility associated with the subject drug were
            implemented effectively using quality risk management as an enabler in support of
            continual improvement. Verify that the subject drug is being manufactured in
            accordance with the approved application or active DMF referenced in the approved
            application, including filed postapproval changes. Confirm that the firm is fulfilling
            or is on track to fulfill commitments (e.g., providing additional stability data) made at
            the time of approval (original application or subsequent submissions) and is meeting
            drug quality reporting requirements in a timely manner.

    It is not uncommon for manufacturers to change facilities (e.g., add a new facility or replace an
    existing facility), introduce changes within a facility, or change production equipment or
    manufacturing and control procedures because of scale-up, process qualification, process
    verification, capacity needs, or improvement plans. The impetus for change may originate from
    internal sources (e.g., the outputs of process performance and product quality monitoring, CAPAs,
    product reviews, audits, adverse trends, OOS results, adoption of advanced manufacturing) or
    external sources (e.g., adverse event reports, FDA inspections, compendia modifications). Change
    management ensures the appropriate execution of changes so that information relevant to the subject
    drug is fed back into the process and control strategy to effect continual improvement and ensure the
    maintenance of a state of control.
    A change management system:
        •   Controls and implements proposed changes that are expected to improve product quality,
            process performance, and robustness.
        •   Ensures that proposed changes that might impact product quality (and thereby potentially
            product safety, effectiveness, or both) are evaluated commensurate with the level of risk to
            patients by using sound scientific and quality risk management principles.




Date of Issuance: 01/27/2023                                                                     Page 24 of 50

第 25 页

                                                                           PROGRAM           7356.843


        •   Documents how the assessed risk was categorized and how it will be managed, controlled, or
            mitigated in the event the proposed change is not implemented.
        •   Ensures that implementation takes place in a timely manner with the approval of the quality
            unit.
        •   Monitors the effects of changes to ensure that they have the intended effect and that there are
            no unintended consequences.
    The change control process should involve input from departments with the expertise needed to
    assess the specific change and to ensure a full understanding of the scope of the change and its
    implications for the process and control strategy.
    Subject matter experts from the relevant departments responsible for implementing a specific change
    determine the type and extent of data (existing or to be newly generated) needed to support the
    change, and develop study protocols describing the methods, prospective acceptance criteria, and
    additional post-implementation process performance or product quality monitoring as necessary.
    As mentioned above, the change control process should also verify that changes have been effective
    in achieving the desired outcome with no unintended consequences. For example, a sufficient
    number of post-implementation commercial batches may be identified for review and evaluation. As
    another example, increasing data-gathering efforts (e.g., evaluating stability batches), as needed,
    confirms that the change objectives are achieved, that there is no deleterious impact on product
    quality, and that the knowledge gained is captured. The impact of each implemented change should
    be evaluated before the affected batches are released.
    During a postapproval inspection, coverage should focus on changes pertaining to the subject drug
    under evaluation rather than on the overall effectiveness or validity of the change control or change
    management system, which is the typical focus of a surveillance-based inspection.

        (1) Objective 3A: Change Management and Change Effectiveness

    The change management system ensures that appropriate science- and knowledge-based risk
    assessments are performed and documented for changes, taking into account the points below:
        •   The level of rigor, effort (e.g., testing, validation, review), and documentation is
            commensurate with the level of risk associated with each change, and each change is
            appropriately categorized according to the associated level of risk as defined by the site.
        •   Risk assessment adequately evaluates the potential risks and benefits of changes to product
            quality, safety, and effectiveness.
        •   Changes and their risks are assessed using current product and process knowledge, including
            appropriate data (available or generated, if needed), to identify current and needed risk
            controls for each change.
    The change management system also ensures that appropriate time and effort have been considered
    in change planning, prioritization, and implementation, taking into account the points below:
        •   The outcomes of risk assessments and the assigned risk levels drive change planning,
            prioritization, and implementation expectations.


Date of Issuance: 01/27/2023                                                                    Page 25 of 50

第 26 页

                                                                                     PROGRAM               7356.843


         •   Data to support the change, as well as acceptance criteria and change effectiveness criteria,
             are predefined in change planning. These may include continued process verification and
             statistical assessments, including process capability and process performance indices—Cpk
             and Ppk—to aid with the quantitative assessment of risk control.
         •   Risks with the current state (until changes are implemented) and risks that might be
             temporarily introduced during the change process are adequately assessed.
         •   Interim controls (short-term measures) are identified and implemented in a timely manner to
             monitor and mitigate risks associated with the current state.
         •   Identified risk control measures are adequately implemented in a timely manner.
         •   Approval to proceed with change implementation or rejection of the change is documented
             with appropriate justification.
         •   Relevant risk assessments are reviewed and are updated after the implementation of changes.
         •   Relevant and timely updates are made to regulatory filings, when appropriate (e.g., annual
             reports must include all changes of relevance to filings; see 21 CFR 314.81 and 314.98).
    In addition to general inspection coverage considerations regarding change management and
    effectiveness, this section includes considerations covering product quality review (PQR) through
    the PQS as an input to change management, ECs, comparability protocols, PLCM documents, and
    supply chain-related changes. 30 For example, changes in the supply chain for APIs, excipients, and
    primary packaging components that occur after approval should be thoroughly evaluated, approved,
    and documented to ensure that they are unlikely to pose an adverse risk to product quality and
    thereby to patients.
    Inspection Coverage
         •   Evaluate changes to facility, product, process, and practices that have occurred since the
             application was approved, or since the last inspection providing coverage of changes for this
             product, that may have affected product quality. Evaluate the scientific justification for and
             implementation of the changes and compare them to the changes contained in postapproval
             submissions.
         •   Determine whether:
                The factors or reasons triggering changes and the related evidence are clearly
                 documented. 31


    30
       See ICH Q12. The PQR is also referred to as an annual product review, which is a regulatory requirement per 21 CFR
    211.180(e).
    31 Examples of common lifecycle factors that trigger change include but are not limited to the following: upgrades to

    equipment or facilities; changes in raw material quality or sourcing; improvements in manufacturing performance and
    consistency (to reduce variability, improve yield, etc.); enhancements in manufacturing capacity; corrections of quality
    issues; and addressing of signals from the PQS such as deviations, complaints/adverse events, CAPAs, product quality
    review, operational review metrics, management review, new regulations, compliance gaps, implementing innovation,
    and continual improvement initiatives.


Date of Issuance: 01/27/2023                                                                                  Page 26 of 50

第 27 页

                                                                                     PROGRAM              7356.843


                Proposed changes for the subject drug have been adequately evaluated using quality risk
                 management principles 32 and have been validated (if needed) and approved for
                 implementation through a formal change control system.
                Proposed changes have been adequately justified with a scientific rationale and data.
                 Confirm that the evaluation of each change has been completed before affected batches
                 were released. 33
                Relevant experts and stakeholders (e.g., subject matter experts, specific departments) are
                 involved in change proposal development and approval. 34
                The objectives, scope, expected outcomes, and anticipated benefits of proposed changes
                 are documented.
                Changes are proposed and formally evaluated in a timely manner, and a decision to
                 accept or reject the proposal is documented. For rejected change proposals, the rationale
                 for rejection is adequately documented.
                Before change closure, the firm has ensured that:
                 ­ Changes have met their intended objectives and predefined effectiveness criteria.
                   Deviations from those criteria are adequately assessed, approved, and managed or
                   justified. Whenever possible, quantitative data are leveraged to objectively determine
                   change effectiveness (e.g., statistical confidence and coverage).
                 ­ As part of the quality risk management activities, residual risks are assessed and
                   managed to acceptable levels, and appropriate adaptations of procedures and controls
                   are implemented.
                 ­ Unintended consequences or risks introduced as a result of changes are evaluated,
                   documented, approved, handled adequately, and are subject to a predefined
                   monitoring time frame.
                Before or after change closure, the firm has ensured that:
                 ­ Post-implementation actions (including those for deviations from predefined
                   acceptance criteria or CAPAs) are identified and completed adequately.
                 ­ Relevant risk assessments are updated after changes are implemented and their
                   effectiveness is assessed. New product/process knowledge resulting from risk
                   assessments are captured in the appropriate quality and operations documents (e.g.,
                   standard operating procedures, reports, product control strategy documents).



    32 See ICH Q9(R1), and Annex II in particular. Bear in mind that an impact assessment, typically performed within the
    change control system, may not be as comprehensive as a risk assessment for proposed changes. Impact assessments
    often assign categorization and determine the change’s regulatory filing but may not always fully address what might go
    wrong or would be improved in the context of current product and process knowledge, the control strategy, and the
    product lifecycle.
    33 See footnote 32 with regard to impact assessment.

    34
       See footnote 28.


Date of Issuance: 01/27/2023                                                                                  Page 27 of 50

第 28 页

                                                                                       PROGRAM              7356.843


                 ­ The effects of implemented changes are actively monitored (e.g., use of additional
                   samples for in-process or stability testing, review of data results after completion of a
                   prespecified number of batches) to confirm that change objectives are achieved and
                   that there is no deleterious impact on product quality.
                 ­ Changes are monitored via ongoing monitoring systems to ensure maintenance of a
                   state of control, 35 and lessons learned are captured and communicated. When
                   deviations associated with postapproval changes are detected:
                      o Risk-mitigating steps are developed in the case of deviations from acceptance
                        criteria or identification of unanticipated risks.
                      o The issue is managed via the firm’s deviation management process and
                        appropriate CAPAs are identified and undertaken via the firm’s CAPA program.
         •   Confirm that implemented changes, as appropriate, were captured and assessed as part of the
             PQR procedures, which are described in further detail under objective 3B in Part III.2.C(2) of
             this compliance program. (Also see “Inspection Coverage—Pharmaceutical Quality System
             Assessment” below.)
    Inspection Coverage—Pharmaceutical Quality System Assessment
         •   Through the review of PQR procedures, confirm that senior management is responsible for
             PQS governance through periodic management review to ensure its continuing suitability and
             effectiveness. 36 When confirming that periodic management reviews are occurring:
                Determine whether management reviews include:
                 ­ Measurement of achievement of PQS objectives.
                 ­ Assessment of performance indicators used to monitor the effectiveness of processes
                   within the PQS (e.g., complaints, deviations, CAPAs, self-assessments, external
                   assessments).
                Determine whether outcomes of management review of the PQS and monitoring of
                 internal and external factors include:
                 ­ Improvements to the PQS and related processes.
                 ­ Allocation or reallocation of resources and personnel training.
                 ­ Revisions to quality policy and quality objectives, as appropriate.
                 ­ Documentation and timely and effective communication of the results of the
                   management review and actions, including escalation of appropriate issues to senior
                   management.




    35
       The inspection coverage related to state of control under this objective may overlap with the inspection coverage
    recommended for stages 2 and 3 of process validation under objectives 1B and 1C, respectively.
    36
       See ICH Q10.


Date of Issuance: 01/27/2023                                                                                    Page 28 of 50

第 29 页

                                                                               PROGRAM            7356.843


    Inspection Coverage—Comparability Protocols and Product Lifecycle Management
           • Determine whether the applicant has an approved comparability protocol or specified and/or
               categorized postapproval changes in a PLCM document.
                   If there is an approved comparability protocol, verify the implementation status of any
                    change.
                    ­ Review that the change as implemented aligns with the comparability protocol.
                    ­ Verify whether the data generated demonstrate that the change objective and
                      acceptance criteria were met.
                   If there is an approved PLCM document:
                    ­ Verify that changes to all ECs are handled per the approved PLCM and changes to
                      parameters unrelated to ECs are managed appropriately under the firm’s PQS.
                    ­ Verify the maintenance status of the document in terms of when and how the
                      document is updated.
                    ­ Review that the document was updated after the change was implemented to capture
                      new product/process knowledge gained during implementation.
                    ­ Verify whether subsequent regulatory filings for the subject drug have been included
                      in the document.
           • If the applicant/manufacturer is not using an approved PLCM document for the subject drug,
               assess and report whether the changes are being reported in a manner that is consistent with
               the appropriate regulations (see 21 CFR 314.70 and 314.97) and guidance documents 37 to
               provide continued assurance of quality for the subject drug over the product lifecycle.
    Inspection Coverage—Supplier/Vendor Qualification and Agreements Assessment
           •   Assess the adequacy of the firm’s supplier qualification program by ensuring that the firm:
                   Evaluated supplier changes for the raw materials, intermediates, or components of the
                    subject drug, as applicable, using the site change management system, evaluated the risk
                    of the supplier change before implementation, and evaluated the quality of the drug and
                    its individual characteristics (such as the impurity profile).
                   Evaluated changes to individual raw material and qualified component suppliers before
                    authorizing the material from those suppliers for use, and reevaluates the reliability of the
                    supplier’s analyses through appropriate validation of the supplier’s test results at
                    appropriate intervals.
                   Maintains defined sampling plans for components to obtain samples that are
                    representative of the shipment and defined acceptance levels to detect unacceptable
                    component variability.



    37
         See footnote 9.


Date of Issuance: 01/27/2023                                                                         Page 29 of 50

第 30 页

                                                                             PROGRAM             7356.843


                Has appropriate controls in place to measure and control variability, such as by
                 periodically challenging the accuracy of the certificate of analysis via performing
                 independent confirmatory testing at a defined frequency.
         •   If the firm has a quality agreement in place with other facilities, including drug applicants,
             for either critical inputs (e.g., ingredients, raw materials) or outputs (e.g., bulk API for
             micronization, bulk in-process material or bulk finished product for further processing such
             as packaging), confirm that it defines communication roles and CGMP responsibilities of
             suppliers, contract manufacturers, and drug manufacturers regarding the notification and
             impact of changes in or deviations from processes or acceptance criteria for the inputs or
             outputs.

         (2) Objective 3B: Conformance to the Application and Other Postmarketing Reports and
             Requirements

    In accordance with statutory and regulatory requirements, 38 applicants must notify FDA of
    manufacturing changes to approved applications before distributing drug products made with such
    changes. Under 21 CFR 314.70 and 314.97, applicants must notify FDA about changes made to the
    conditions and the variations in the conditions that were established in approved applications. These
    regulations identify three broad reporting categories: major changes, which require submission of a
    prior approval supplement (PAS); moderate changes, which require submission of a changes being
    effected in 30 days (CBE-30) supplement or a CBE-0 supplement; and minor changes, which must
    be reported in an annual report. The reporting category for a change is based on the potential risk for
    the change to have an adverse effect on the identity, strength, quality, or purity of the drug product
    as these factors may relate to its safety or effectiveness. If an application includes approved ECs
    with specified reporting categories (see Part 1—Background), the reporting category reflected in the
    PLCM document is considered the appropriate submission type for a postapproval change to that
    EC.
    Applicants of NDAs and ANDAs are required to file FARs for relevant quality issues concerning
    distributed product batches pursuant to 21 CFR 314.81. A failure to file a report is considered a
    significant violation and subject to a Form FDA 483 citation. 39
    Firms conduct periodic PQRs—annually at a minimum or more frequently on a rolling basis—to
    verify reliability and performance of the existing process in delivering quality product, verify the
    appropriateness of current specifications for raw materials (including starting materials),
    components, and the subject drug, and identify trends in product quality and process performance
    that warrant change. 40
    PQRs, taking into account previous reviews, include at least the following for the subject drug, as
    applicable:


    38 See section 506A of the FD&C Act (21 U.S.C. 356a).
    39
       See compliance program 7356.021—Drug Quality Reporting System (DQRS) (MedWatch Reports) NDA Field Alert
    Reporting (FARs) and guidance for industry Field Alert Report Submission: Questions and Answers.
    40
       See 21 CFR 211.180(e).


Date of Issuance: 01/27/2023                                                                        Page 30 of 50

第 31 页

                                                                                  PROGRAM              7356.843


         •   Review of quality specifications for raw materials, intermediates, components, container
             closure systems, and packaging materials as pertain to the subject drug, especially those from
             new sources.
         •   Review of supplier qualification or requalification reports for supplied materials,
             components, or other outsourced contract manufacturing activities or services.
         •   Review of critical in-process controls, tests, in-process specifications, test results for in-
             process materials, and the final specifications and test results for the subject drug.
         •   Review of batches that failed to meet established specifications and their related
             investigations.
         •   Review of significant deviations or nonconformances, their related investigations, and the
             effectiveness of resultant CAPAs taken.
         •   Review of changes to processes or analytical methods.
         •   Review of supplements approved or issued a complete response action.
         •   Review of the results of the stability monitoring program and adverse trends.
         •   Review of quality-related returns, complaints, and recalls and the investigations performed at
             the time.
         •   Review of the adequacy of previous product process or equipment corrective actions.
         •   The qualification status of relevant equipment and utilities (e.g., HVAC, water, compressed
             gases).
    Inspection Coverage 41
         •   Review the timeliness of notification via FARs for issues that have the potential to impact
             product on the market.
         •   Evaluate the status of defined postmarketing commitments or postmarketing reporting
             requirements that the applicant had agreed to fulfill in a timely manner as part of the
             authorization for the initial approval of the NDA. 42
         •   Review changes that have been implemented since approval for the drug product and
             determine whether the changes were properly reported to FDA.
         •   Evaluate if the firm has underestimated changes in terms of their potential impact on product
             quality and type of change to the regulatory filing (e.g., as a minor change requiring an
             annual report submission instead of as a moderate change requiring a CBE-30 supplement).



    41See footnote 21.
    42
      Postmarketing commitments are otherwise known as quality postmarketing agreements (QPAs) as defined in the draft
    guidance for industry Benefit-Risk Considerations for Product Quality Assessments. Postmarketing reporting
    requirements refer to “Other postmarketing reports” as required under 21 CFR 314.81—in particular 314.81(b)(2)(iv),
    (vii), (viii), and (ix) for NDAs—and the same for ANDAs under 21 CFR 314.98—in particular 314.98(c).


Date of Issuance: 01/27/2023                                                                              Page 31 of 50

第 32 页

                                                                          PROGRAM           7356.843


        •   Evaluate if the firm manufactured and improperly distributed any batches with changes that
            required prior FDA approval.
        •   Determine whether manufacturing is consistent with what was included in the application
            (e.g., if manufacturing and analytical equipment, manufacturing process, process controls, in-
            process and release tests, specifications, and methods employed are the same as those
            documented in the application).
        •   Confirm and as necessary report back whether the commitments made by the applicant, at the
            time the application or application supplement was approved, have been completed or are
            underway.
        •   Verify that the firm:
                Evaluates PQR results and assesses whether to undertake CAPAs, change proposals, or
                 process revalidation for continual improvement.
                Uses quality risk management to evaluate proposed CAPAs, changes, or process
                 revalidation.
                Completes actions that are undertaken as a result of a PQR in a timely and effective
                 manner.
                Has procedures for the ongoing management and review of actions undertaken as a result
                 of PQRs and verifies the effectiveness of these procedures during self-inspection.
                Reviews the effectiveness of actions undertaken as a result of a PQR at the next PQR.

        (3) Related Resources

    Regulations
        •   21 CFR 211.198, 310.305, 314.70, 314.80, 314.81, 314.97, 314.98
    Guidance for Industry
        •   Changes to an Approved Application for Specified Biotechnology and Specified Synthetic
            Biological Products (July 1997)
        •   Changes to an Approved NDA or ANDA (April 2004)
        •   Changes to an Approved NDA or ANDA: Questions and Answers (January 2001)
        •   CMC Postapproval Manufacturing Changes for Specified Biological Products to be
            Documented in Annual Reports (December 2021)
        •   CMC Postapproval Manufacturing Changes To Be Documented in Annual Reports (March
            2014)
        •   Comparability Protocols for Postapproval Changes to the Chemistry, Manufacturing, and
            Controls Information in an NDA, ANDA, or BLA (October 2022)
        •   Field Alert Report Submission: Questions and Answers (July 2021)



Date of Issuance: 01/27/2023                                                                   Page 32 of 50

第 33 页

                                                                                        PROGRAM   7356.843


           •   SUPAC-IR: Immediate-Release Solid Oral Dosage Forms: Scale-Up and Postapproval
               Changes: Chemistry, Manufacturing, and Controls, In Vitro Dissolution Testing, and In Vivo
               Bioequivalence Documentation (November 1995)
           •   SUPAC-MR: Modified Release Solid Oral Dosage Forms: Scale-Up and Postapproval
               Changes: Chemistry, Manufacturing, and Controls; In Vitro Dissolution Testing and In Vivo
               Bioequivalence Documentation (September 1997)
           •   SUPAC-SS: Nonsterile Semisolid Dosage Forms; Scale-Up and Postapproval Changes:
               Chemistry, Manufacturing, and Controls; In Vitro Release Testing and In Vivo
               Bioequivalence Documentation (May 1997)
    Draft Guidance for Industry 43
           •   ICH Q12: Implementation Considerations for FDA-Regulated Products (May 2021)
           •   Postapproval Changes to Drug Substances (September 2018)
           •   SUPAC: Manufacturing Equipment Addendum (December 2014)
    ICH Guidance for Industry
           •   Q10 Pharmaceutical Quality System (April 2009)
           •   Q12 Technical and Regulatory Considerations for Pharmaceutical Product Lifecycle
               Management (May 2021)

           D. Objective 4: Integrity of Product Quality Data

               Summary: Audit manufacturing controls, test results, and the related raw data for
               starting materials, in-process materials, and batches of the subject drug. Ensure that
               the test and production data are authentic, computed correctly, accurate, and
               documented per CGMP and that they support the associated decisions by the firm,
               application submissions, and lifecycle changes.

    This section emphasizes the importance of data integrity when it has been specifically requested as
    part of inspectional coverage in the assignment. Additionally, at the discretion of the lead
    investigator, data integrity coverage may be added when problems are found. Sufficient coverage
    should be afforded to confirm the integrity of data relating to process performance and product
    quality.

    During routine production, firms generate a substantial amount of manufacturing and laboratory
    data. Analysis of these data and evaluation of analytical methods ensures that firms are capable of
    consistently maintaining process control, meeting quality specifications, and reliably producing
    product of intended quality. Complete, consistent, and accurate data should be attributable, legible,



    43
         When final, these guidances will represent the FDA’s current thinking on these topics.


Date of Issuance: 01/27/2023                                                                        Page 33 of 50

第 34 页

                                                                                     PROGRAM               7356.843


    contemporaneously recorded, original or a true copy, and accurate (ALCOA). 44 Analysis of product
    quality data (e.g., release and stability data) also ensures that the quality unit adequately responds to
    unexpected or aberrant results in a timely manner so as to prevent poor quality drug products from
    reaching the marketplace.
    If a pattern of data reliability issues is identified during the inspection, the investigator should consider
    expanding the coverage to surveillance of marketed products manufactured in the facility using
    compliance program 7356.002. If data reliability issues are documented for other products during an
    expanded inspection, this suggests a broader pattern that implicates all products manufactured at the
    facility. If so, ORA should consider submitting a recommendation that CDER consider invoking the
    Application Integrity Policy (AIP) or that a for-cause inspection be planned to further define the scope of
    the data reliability issues. 45
    Inspection Coverage
         •   Assess the firm’s ability to effectively manage hard copy (paper), computerized, and hybrid
             data systems by having user access control mechanisms and verifiable audit trails, where
             appropriate, for collection, reporting, and archiving of information for the subject drug.
                Determine whether data are calculated and reported using reliable and verifiable
                 mechanisms, interpreted using sound scientific rationale, and maintained using validated
                 systems.
                Determine if there were data not reported in the submission, supplement, or annual report
                 that should have been.
                Evaluate whether there were inaccurate, misleading, manipulated, or incomplete data in
                 CGMP documents and submissions.
         •   Evaluate representative raw data relating to process performance and product quality,
             including the raw data from the in-process, release, and stability testing, to determine if there
             is a pattern of data reliability issues that impact:
                The quality specifications of the subject drug.
                The retest or expiry date or labeled expiration dating.




    44
       These characteristics are important to ensuring data integrity and are addressed throughout the CGMP regulations for
    drug products. For attributable, see 21 CFR 211.101(d), 211.122, 211.186, 211.188(b)(11), and 212.50(c)(10); for
    legible, see 21 CFR 211.180(e) and 212.110(b); for contemporaneously recorded (at the time of performance), see 21
    CFR 211.100(b) and 211.160(a); for original or a true copy, see 21 CFR 211.180 and 211.194(a); and for accurate, see
    21 CFR 211.22(a), 211.68, 211.188, and 212.60(g).
    45
       Contact information and procedures for OC’s Office of Manufacturing Quality are on the AIP website at
    https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/compliance-actions-and-
    activities/application-integrity-policy. See also CPG Sec 120.100 Fraud, Untrue Statements of Material Facts, Bribery,
    and Illegal Gratuities, https://www.fda.gov/regulatory-information/search-fda-guidance-documents/cpg-sec-120100-
    fraud-untrue-statements-material-facts-bribery-and-illegal-gratuities.


Date of Issuance: 01/27/2023                                                                                   Page 34 of 50

第 35 页

                                                                                    PROGRAM              7356.843


                The analytical methods employed as part of the approved control strategy (e.g., methods
                 do not conform to those approved in the application). 46

         (1) Related Resources

    Guidance for Industry
         •   Analytical Procedures and Methods Validation for Drugs and Biologics (July 2015)
         •   Data Integrity and Compliance With Drug CGMP: Questions and Answers (December 2018)
         •   Investigating Out-of-Specification (OOS) Test Results for Pharmaceutical Production
             (October 2006)
    Other FDA Resources
         •   Compliance program 7346.832―Preapproval Inspections, III.1.B(3) Data Integrity Audit
             (October 2022)
         •   Guide to Inspection of Microbiological Pharmaceutical Quality Control Laboratories (July
             1993)
         •   Guide to Inspection of Pharmaceutical Quality Control Laboratories (July 1993)

    3. Inspection Reporting

    The inspection team performs the inspection following this compliance program and provides
    coverage in the areas of concern.

         A. Issuance of Form FDA 483

    Consistent with instructions in the IOM, use Form FDA 483 to communicate reportable observations
    and CGMP deficiencies pertaining to the subject drug.
    Refer to Part V—Regulatory/Administrative Strategy―for a list of issues that may result in a 483
    observation.
    If the postapproval inspection is concurrent with or expanded to CGMP surveillance, organize Form
    FDA 483 according to compliance program 7356.002 and the IOM.

         B. Completion and Assessment of the Establishment Inspection Report

    The inspection team prepares a narrative EIR per instructions in the IOM (chapter 5). In all cases,
    ORA and CDER (OPMA, Office of Manufacturing Quality (OMQ), or both as described in Part V)
    collaboratively evaluate the inspection team’s report within the context of the application and
    communicate relevant findings or concerns to the IQA team.


    46
      FDA expects the quality unit to control and approve changes made to these methods and, based on the significance of
    the change in the method, communicate those changes to FDA.


Date of Issuance: 01/27/2023                                                                                Page 35 of 50

第 36 页

                                                                         PROGRAM            7356.843


    For postapproval inspections with significant deficiencies, CDER (OPMA, OMQ, or both as
    described in Part V) evaluates the inspection team’s findings and the firm’s response and makes a
    final recommendation on the adequacy of the firm’s response for the covered application and/or the
    facility. CDER (OPMA or OMQ as appropriate) communicates the final recommendation
    (concurrence/nonconcurrence) to ORA.

    4. Sample Collection or Sample Submission Requests

    Investigators should not routinely collect samples during the postapproval inspection. Samples of
    potentially defective subject drugs may be collected to constitute persuasive evidence that significant
    CGMP problems exist. Physical samples may be an integral part of a CGMP inspection where
    control deficiencies are observed. Physical samples should be correlated with observed control
    deficiencies. Contact a program coordinator in the ORS Office of Medical Products, Tobacco, and
    Specialty Laboratory Operations ([email protected]) for guidance
    on the types of samples to be collected (in-process or drug product) and for the appropriate analytical
    servicing laboratory. Documentary samples may be submitted when the documentation illustrates the
    deficiencies better than a physical sample. ORA divisions may elect to collect, but not analyze,
    physical samples, or to collect documentary samples to document CGMP deficiencies. Physical
    sample analysis is not necessary to document CGMP deficiencies. For sampling guidance, refer to
    IOM chapter 4—Sampling.
    If an official sample is collected at an establishment, use the PACs on the assignment to report
    sample collection/analysis time.




Date of Issuance: 01/27/2023                                                                   Page 36 of 50

第 37 页

                                                                       PROGRAM           7356.843


                                       PART IV—ANALYTICAL

    Contact ORS’ Office of Medical Products, Tobacco, and Specialty Laboratory Operations
    ([email protected]) for the analytical servicing laboratories for
    chemical and microbiological testing. When contacting ORS for analytical servicing laboratories,
    provide the product description, lots to be tested, analyses to be performed, and reason for the
    sample collection.
    The analytical servicing laboratory uploads completed analytical worksheets for the product samples
    analyzed to CMS and submits the original worksheet package to the ORA home district office of the
    manufacturing facility.
    If warranted, ORA division offices will recommend an appropriate regulatory action to CDER.




Date of Issuance: 01/27/2023                                                                Page 37 of 50

第 38 页

                                                                                         PROGRAM               7356.843


                         PART V―REGULATORY / ADMINISTRATIVE STRATEGY

    ORA inspects the establishment named in an application and provides an initial recommendation on
    its acceptability. If there are significant issues that would adversely impact the establishment’s
    ability to perform its designated functions as described in the application, the lead investigator
    documents the nature and scope of significant deviations and observations found during the
    postapproval inspection for the subject drug.

    1. Significant Issues

    Examples of significant issues for the subject drug include but are not limited to the following 47:
         1. Lack of or inadequate process validation (e.g., unsuitable equipment, inadequate process
            performance qualification, unreliable state of control) to support distribution of the subject
            drug.
         2. Lack of or inadequate validation of test methods for raw materials, in-process materials, or
            the subject drug.
         3. Release or distribution of batches that deviated from the site’s established procedures as well
            as the controls in the approved application (e.g., reprocessing or rework operations, process
            controls, test methods, raw material, in-process material specifications, and subject drug
            specifications).
         4. Failure to investigate and resolve quality problems (e.g., manufacturing issues, including
            stability failures, OOS or OOT results, consumer complaints) for distributed batches.
         5. Failure to investigate and document the root cause of deviations, failure to initiate CAPAs to
            correct deviations and prevent them from recurring, and failure to assess the impact on
            product quality.
         6. Failure of the quality unit to adequately review, assess, and approve changes relevant to the
            subject drug.
         7. A finding of data integrity problems. 48
         8. Failure to meet application commitments by the agreed-upon timeline without a reasonable
            justification and with no or inadequate communication to FDA.
         9. Failure to report or inadequate reporting of changes made to the subject drug, as applicable
            (e.g., changes made to approved ECs).



    47
       In general, issues 1 to 7 are considered typical examples of CGMP deficiencies, whereas issues 8 and 9 are typical
    examples of application-related issues. Issues related to drugs that have already been distributed are considered more
    significant for potential negative impact to patients or consumers.
    48
       Findings related to raw data integrity or falsification of data generated at the manufacturing site and used in support of
    product quality decisions relevant to the subject drug should be considered for a systemic CGMP impact on current
    operations (e.g., across all manufacturing operations or across all manufactured products as applicable) at the
    establishment.


Date of Issuance: 01/27/2023                                                                                       Page 38 of 50

第 39 页

                                                                          PROGRAM            7356.843


    If significant issues are identified during the postapproval inspection, the lead ORA investigator, as
    indicated in Part II.3.E of this compliance program, should consider expanding the scope of the
    inspection to include compliance program 7356.002 coverage.

    2. Coordination for Regulatory/Administrative Follow-Up Actions to Inspection Findings

    Inspection findings that demonstrate that the manufacturing process is not operating under a state of
    control may be used as evidence for taking appropriate advisory, administrative, or judicial actions.
    The initial classification of the inspection should be based on the ORA division’s assessment of the
    seriousness of the inspectional issues observed.
    The endorsement of the inspection report will point out the actions by the firm that have been or will
    be taken and the timeline for the actions. All deficiencies noted in inspections under this compliance
    program must be addressed by stating the firm’s corrective actions, accomplished or projected, for
    each deficiency as established in the discussion with the firm’s management at the close of the
    inspection.
    If an inspection report documents significant deficiencies for the subject drug or finds one or more
    systems at the establishment that are not in a state of control with or without the expanded inspection
    coverage under compliance program 7356.002, consider an initial OAI classification for impacted
    PACs.

        A. Issues That Are Considered Significant for PAC 56843

    The issues that are considered significant for PAC 56843 may impact other drug products or APIs
    besides the subject drug under inspection. OMQ and OPMA, when appropriate (i.e., specifically for
    the subject drug), will collaborate on the determination of combined actions (e.g., regulatory,
    advisory, enforcement). OMQ, ORA, and OPMA will subsequently collaborate on related
    communication with the firm or applicant, as appropriate.
    When the postapproval inspection identifies the presence of significant CGMP deficiencies for the
    subject drug, as described in Part V of this compliance program, or if the postapproval inspection is
    combined with surveillance inspection coverage and there are significant deficiencies identified as
    described in Part V—Regulatory/Administrative Strategy of compliance program 7356.002, the
    inspection should result in an initial OAI classification recommendation to OMQ.
    In these instances, OMQ will act as the lead office tasked with completing the final assessment,
    providing a compliance recommendation, and issuing the FMD-145 letter to the firm. To support
    OMQ’s efforts, OPMA may assign a point of contact to actively assist in the review of the inspection
    report and the firm’s responses to the 483 observations. When appropriate, OMQ can also initiate a
    product-specific consult to OPMA (such as to solicit subject matter expert opinion on the impact of
    identified microorganisms or other complex manufacturing process or facility issues). When
    necessary, OPMA will reach out to appropriate OPQ suboffices in response to the OMQ consult.
    Regulatory, advisory, or enforcement actions may include one or more of the following:
        •   Hold a regulatory meeting (or meetings) with the manufacturer.



Date of Issuance: 01/27/2023                                                                   Page 39 of 50

第 40 页

                                                                                      PROGRAM               7356.843


         •   Issue a warning letter (or other advisory notice).
         •   Pursue an import alert (for foreign manufacturers).
         •   Order a cease distribution or product recall or recommend a product recall. 49
         •   Pursue product seizure.
         •   Pursue establishment injunction.
         •   Suspend product approval.
         •   Withdraw or revoke product approval (following the opportunity for a hearing or an
             opportunity to demonstrate compliance).
         •   Withhold the approval of pending applications and application supplements requiring an
             evaluation of the establishment.
         •   Invoke FDA’s Application Integrity Policy.
         •   Pursue prosecution.
         •   Pursue the imposition of civil money penalties.
         •   Initiate an administrative detention of the subject drug, per 21 CFR 1.980.
    The postapproval inspection may find no significant CGMP deficiencies but may identify
    application-related issues with an initial OAI classification for PAC 56843 requiring CDER’s
    follow-up. 50 In these instances, OPMA will lead the assessment of the inspection outcomes on the
    subject drug application, coordinate with the IQA team for subsequent follow-up actions or
    communications with the applicant or the facility as necessary, and act as the lead office tasked with
    completing the final assessment and issuing the FMD-145 letter to the firm. To support OPMA’s
    efforts, OMQ may assign a point of contact to actively assist in the review of the inspection report as
    well as other relevant inspectional documents. When appropriate, OPMA can also initiate a
    compliance-specific consult to OMQ. When necessary, OMQ will reach out to appropriate OC
    suboffices in response to the OPMA consult. OPQ can ask the applicant, site, and related programs,
    as needed, to undertake follow-up actions regarding subject drug-related issues. Follow-up actions
    may include, but are not limited to:
         •   Requesting that an applicant submit a supplement to modify ECs named in the application.
         •   Notifying the applicant that the reporting categories previously approved in the application
             related to the facility subject to the postapproval inspection will revert to reporting categories
             consistent with the risk-based paradigm in the regulations and as recommended in guidance
             until adequate corrections have been verified.
    Lack of follow-up on these application-focused corrections may also impact pending applications.


    49
      For a cease distribution or product recall of a controlled substance, refer to section 569D of the FD&C Act.
    50
      Examples of application-related issues include an inappropriate change reporting category, failure to meet application
    commitments relevant to drug quality, failure to submit annual reports, and concerns about the PQS that impact an
    approved PLCM document or suggest that additional ECs should be included in the application.


Date of Issuance: 01/27/2023                                                                                   Page 40 of 50

第 41 页

                                                                             PROGRAM          7356.843


    OPMA works with other offices (e.g., Office of Combination Products (OCP) and Office of the
    Chief Counsel (OCC), Office of Generic Drugs (OGD), OMQ) to determine the appropriate
    administrative actions, which may include but are not limited to the following:
           •   FDA-initiated request to the applicant to update an existing approved application.
           •   Withdrawal of approval status of the application (NDA and ANDA) or its suspension under
               section 505(e) of the FD&C Act (see also 21 CFR 314.150(b), 314.151, and 314.153).
    After the final classification of the inspection has been completed, OQS updates the surveillance risk
    model, when appropriate, with the information gained from the inspection.

           B. Issues That Are Not Considered Significant for PAC 56843

    If the facility inspection indicates an NAI or VAI classification and no further action is
    recommended, ORA issues an FMD-145 letter within the predefined timeline based on the date of
    the inspection closing. 51 OPQ suboffices (e.g., OPMA) may assist ORA divisions as requested.




    51
         See FMD-145—Release of the Establishment Inspection Report (EIR).


Date of Issuance: 01/27/2023                                                                        Page 41 of 50

第 42 页

                                                                          PROGRAM           7356.843


     PART VI—REFERENCES, ATTACHMENT, PROGRAM CONTACTS, AND ACRONYMS

    1. References

        A. Code of Federal Regulations, Title 21
           https://www.ecfr.gov/current/title-21

    21 CFR part 1
    21 CFR part 210
    21 CFR part 211
    21 CFR part 212
    21 CFR part 310
    21 CFR part 314

        B. Compliance Programs
           https://www.fda.gov/drugs/guidance-compliance-regulatory-information/drug-compliance-programs

    7346.832—Preapproval Inspections
    7356.002—Drug Manufacturing Inspections
    7356.002A—Sterile Drug Process Inspections
    7356.002C—Radioactive Drugs
    7356.002F—Active Pharmaceutical Ingredients
    7356.002P—Positron Emission Tomography (PET) CGMP Drug Process and Pre-approval
    Inspections/Investigations
    7356.021—Drug Quality Reporting System (DQRS) (MedWatch Reports) NDA Field Alert
    Reporting (FARs)

        C. Compliance Policy Guide
           https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/compliance-
           manuals/manual-compliance-policy-guides
    CPG Sec. 120.100 Fraud, Untrue Statements of Material Facts, Bribery, and Illegal Gratuities




Date of Issuance: 01/27/2023                                                                   Page 42 of 50

第 43 页

                                                                         PROGRAM           7356.843


        D. FDA Guidances
           https://www.fda.gov/drugs/guidance-compliance-regulatory-information/guidances-drugs

        (1) Guidance for Industry

    Analytical Procedures and Methods Validation for Drugs and Biologics (July 2015)
    Changes to an Approved Application for Specified Biotechnology and Specified Synthetic Biological
    Products (July 1997)
    Changes to an Approved NDA or ANDA (April 2004)
    Changes to an Approved NDA or ANDA: Questions and Answers (January 2001)
    Circumstances That Constitute Delaying, Denying, Limiting, or Refusing a Drug Inspection
    (October 2014)
    CMC Postapproval Manufacturing Changes for Specified Biological Products to be Documented in
    Annual Reports (December 2021)
    CMC Postapproval Manufacturing Changes To Be Documented in Annual Reports (March 2014)
    Comparability Protocols for Postapproval Changes to the Chemistry, Manufacturing, and Controls
    Information in an NDA, ANDA, or BLA (October 2022)
    Control of Nitrosamine Impurities in Human Drugs, Rev. 1 (February 2021)
    Current Good Manufacturing Practice Requirements for Combination Products (January 2017)
    Data Integrity and Compliance With Drug CGMP: Questions and Answers (December 2018)
    Field Alert Report Submission: Questions and Answers (July 2021)
    Investigating Out-of-Specification (OOS) Test Results for Pharmaceutical Production (October
    2006)
    Manufacturing, Supply Chain, and Drug and Biological Product Inspections During COVID-19
    Public Health Emergency: Questions and Answers (May 2021)
    Media Fills for Validation of Aseptic Preparations for Positron Emission Tomography (PET) Drugs
    (April 2012)
    PET Drugs—Current Good Manufacturing Practice (CGMP) (December 2009)
    PET Drugs—Current Good Manufacturing Practice (CGMP), Small Entity Compliance Guide
    (August 2011)
    Process Validation: General Principles and Practices (January 2011)
    Quality Systems Approach to Pharmaceutical CGMP Regulations (September 2006)
    Questions and Answers on Current Good Manufacturing Practices for Drugs (March 2018)
    Remote Interactive Evaluations of Drug Manufacturing and Bioresearch Monitoring Facilities
    During the COVID-19 Public Health Emergency (April 2021)




Date of Issuance: 01/27/2023                                                                  Page 43 of 50

第 44 页

                                                                                        PROGRAM   7356.843


    Sterile Drug Products Produced by Aseptic Processing—Current Good Manufacturing Practice
    (October 2004)
    SUPAC-IR: Immediate-Release Solid Oral Dosage Forms: Scale-Up and Postapproval Changes:
    Chemistry, Manufacturing, and Controls, In Vitro Dissolution Testing, and In Vivo Bioequivalence
    Documentation (November 1995)
    SUPAC-MR: Modified Release Solid Oral Dosage Forms: Scale-Up and Postapproval Changes:
    Chemistry, Manufacturing, and Controls; In Vitro Dissolution Testing and In Vivo Bioequivalence
    Documentation (September 1997)
    SUPAC-SS: Nonsterile Semisolid Dosage Forms; Scale-Up and Postapproval Changes: Chemistry,
    Manufacturing, and Controls; In Vitro Release Testing and In Vivo Bioequivalence Documentation
    (May 1997)

    Draft guidance 52
    Benefit-Risk Considerations for Product Quality Assessments (May 2022)
    Conducting Remote Regulatory Assessments: Questions and Answers (July 2022)
    ICH Q12: Implementation Considerations for FDA-Regulated Products (May 2021)
    Postapproval Changes to Drug Substances (September 2018)
    SUPAC: Manufacturing Equipment Addendum (December 2014)

           (2) ICH Guidance for Industry

    Q7 Good Manufacturing Practice Guidance for Active Pharmaceutical Ingredients (September
    2016)
    Q8(R2) Pharmaceutical Development (November 2009)
    Q9(R1) Quality Risk Management, Draft (June 2022)
    Q10 Pharmaceutical Quality System (April 2009)
    Q11 Development and Manufacture of Drug Substances (November 2012)
    Q12 Technical and Regulatory Considerations for Pharmaceutical Product Lifecycle Management
    (May 2021)

           E. Other Procedures and References

    Application Integrity Policy, https://www.fda.gov/inspections-compliance-enforcement-and-
    criminal-investigations/compliance-actions-and-activities/application-integrity-policy
    FMD-145—Release of the Establishment Inspection Report (EIR) (July 2019),
    https://www.fda.gov/media/83055/download


    52
         When final, these guidances will represent the FDA’s current thinking on these topics.


Date of Issuance: 01/27/2023                                                                        Page 44 of 50

第 45 页

                                                                       PROGRAM           7356.843


    Inspection Guides, https://www.fda.gov/inspections-compliance-enforcement-and-criminal-
    investigations/inspection-references/inspection-guides
        •   Pharmaceutical Quality Control Laboratories (July 1993)
        •   Microbiological Pharmaceutical Quality Control Laboratories (July 1993)
    Integration of FDA Facility Evaluation and Inspection Program for Human Drugs: A Concept of
    Operations (June 2017), https://www.fda.gov/drugs/pharmaceutical-quality-resources/integration-
    fda-facility-evaluation-and-inspection-program-human-drugs-concept-operations
    Investigations Operations Manual (2021), https://www.fda.gov/inspections-compliance-
    enforcement-and-criminal-investigations/inspection-references/investigations-operations-manual
    Pharmaceutical Quality for the 21st Century—A Risk-Based Approach: Progress Report (May
    2007), https://www.fda.gov/about-fda/center-drug-evaluation-and-research/pharmaceutical-quality-
    21st-century-risk-based-approach-progress-report
    Points to Consider for Internal Reviews and Corrective Action Operating Plans (June 1991),
    https://www.fda.gov/inspections-compliance-enforcement-and-criminal-investigations/application-
    integrity-policy/points-consider-internal-reviews-and-corrective-action-operating-plans-june-1991-
    food-and-drug
    Regulatory Procedures Manual (July 2021), https://www.fda.gov/inspections-compliance-
    enforcement-and-criminal-investigations/compliance-manuals/regulatory-procedures-manual
    Staff Manual Guide 9004.1, Policy and Procedures for Requesting Records in Advance of or in Lieu
    of a Drug Inspection (August 2017), https://www.fda.gov/media/124338/download
    United States Pharmacopeia (USP), https://www.uspnf.com
    An Update to the Resiliency Roadmap for FDA Inspectional Oversight (November 2021),
    https://www.fda.gov/media/154293/download

    2. Attachment

    Attachment A: Remote Regulatory Assessments

    3. Program Contacts

        A. Office of Regulatory Affairs

            Office of Medical Products and Tobacco Operations
            Office of Pharmaceutical Quality Operations, Division of Pharmaceutical Quality Programs,
            Pharmaceutical Quality Initiatives Branch
            ORA program coordinators: See the ORA Directory in the IOM for updated references,
            https://www.fda.gov/files/inspections,%20compliance,%20enforcement,%20and%20criminal
            %20investigations/published/ORA--Directory.pdf




Date of Issuance: 01/27/2023                                                                Page 45 of 50

第 46 页

                                                                         PROGRAM            7356.843


            Office of Regulatory Science
            Office of Medical Products, Tobacco, and Specialty Laboratory Operations
            Staff Director
            [email protected]

        B. Center for Drug Evaluation and Research

            CGMP or Quality-Related Policy Questions
            For CGMP or quality-related policy, technical, or scientific questions or information needs,
            including questions about this program, send an email to the following address and it will be
            handled as a top priority:
            [email protected]

            Product-Specific Inspection-Related Questions:
            For questions about a product-specific postapproval inspection under this program, contact
            the OPMA Postapproval Program mailbox:
            [email protected]

            Office of Compliance: Enforcement-Related Guidance or Policy
            For enforcement-related guidance or policy, including evidence need and sufficiency,
            citations, and case evaluation/recommendation advice related to marketed products or
            surveillance coverage, send an email to the following address and it will be handled as a top
            priority:
            [email protected]

    4. Acronyms

    ALCOA         attributable, legible,                   CDER        Center for Drug Evaluation and
                  contemporaneously recorded,
                                                                       Research
                  original or a true copy, and
                  accurate                                 CGMP        current good manufacturing
                                                                       practice
    ANDA          abbreviated new drug application
                                                           CMC         chemistry, manufacturing, and
    API           active pharmaceutical ingredient                     controls
    CAPA          corrective action and preventive         CMS         Compliance Management
                  action                                               Services
    CBE           changes being effected                   Cpk         process capability index




Date of Issuance: 01/27/2023                                                                  Page 46 of 50

第 47 页

                                                                 PROGRAM           7356.843


    DMF           drug master file                   OPMA      Office of Pharmaceutical
                                                               Manufacturing Assessment
    DOE           design of experiment
                                                     OPQ       Office of Pharmaceutical Quality
    EC            established condition
                                                     OPQO      Office of Pharmaceutical Quality
    eDRLS         Electronic Drug Registration and
                                                               Operations
                  Listing System
                                                     OQS       Office of Quality Surveillance
    EIR           establishment inspection report
                                                     ORA       Office of Regulatory Affairs
    FAR           field alert report
                                                     ORA PAM ORA preapproval program
    FD&C Act Federal Food, Drug, and Cosmetic
                                                             manager
             Act
                                                     ORADSS Online Reporting Analysis
    ICH           International Council for
                                                            Decision Support System
                  Harmonisation
                                                     ORS       Office of Regulatory Science
    IOM           Investigations Operations Manual
                                                     PAC       product/assignment code
    IQA           integrated quality assessment
                                                     PACMP     postapproval change management
    MRA           mutual recognition agreement
                                                               protocol
    NAI           No Action Indicated
                                                     PAI       preapproval inspection
    NDA           new drug application
                                                     PET       positron emission tomography
    OAI           Official Action Indicated
                                                     PLCM      product lifecycle management
    OC            Office of Compliance
                                                     pOAI      potential Official Action Indicated
    OCC           Office of the Chief Counsel
                                                     Ppk       process performance index
    OCP           Office of Combination Products
                                                     PPQ       process performance qualification
    OGD           Office of Generic Drugs
                                                     PQR       product quality review
    OMPTO         Office of Medical Products and
                                                     PQS       pharmaceutical quality system
                  Tobacco Operations
                                                     RIE       remote interactive evaluation
    OMQ           Office of Manufacturing Quality
                                                     RRA       remote regulatory assessments
    OOS           out-of-specification
                                                     SUPAC     Scale-Up and Postapproval
    OOT           out-of-trend
                                                               Changes
                                                     VAI       Voluntary Action Indicated




Date of Issuance: 01/27/2023                                                            Page 47 of 50

第 48 页

                                                                         PROGRAM           7356.843


                      PART VII―OVERVIEW OF CDER-ORA RESPONSIBILITIES

    CDER and ORA redefined their roles and responsibilities regarding application assessments and
    inspections of human drugs facilities under the ConOps agreement Integration of FDA Facility
    Evaluation and Inspection Program for Human Drugs: A Concept of Operations. This ConOps
    operating model applies to pre- and postapproval, surveillance, and for-cause inspections.
    Postapproval facility inspections are led by ORA with CDER participation. The roles and
    responsibilities for postapproval inspections as laid out in ConOps are subject to this compliance
    program.




Date of Issuance: 01/27/2023                                                                  Page 48 of 50

第 49 页

                                                                                  PROGRAM              7356.843


                      ATTACHMENT A: REMOTE REGULATORY ASSESSMENTS

    In addition to its inspectional authority, FDA may conduct remote regulatory assessments (RRAs),
    under certain circumstances, to support oversight of FDA-regulated products and establishments. 1
    An RRA is an examination of an FDA-regulated establishment and/or its records, conducted
    remotely, to evaluate compliance with applicable FDA requirements. RRAs assist in protecting
    human health, informing regulatory decisions, and verifying certain information submitted to the
    Agency.
    RRAs used in lieu of or in advance of inspections have allowed FDA to remotely evaluate drug
    manufacturing establishments to mitigate risks. However, RRAs are not the same as an inspection as
    described in section 704(a)(1) of the Federal Food, Drug, and Cosmetic Act (FD&C Act), and FDA
    does not consider them to satisfy the statutory requirement for an inspection under section 510(h) of
    the FD&C Act.
    The following RRAs, along with applicable FDA policies, can be used to support the objectives of
    this compliance program when, in the opinion of FDA experts, they would enable FDA to determine
    whether the establishment meets applicable requirements for the product’s identity, strength, quality,
    and purity for an application subject to section 505 of the FD&C Act.

    1. FDA Records and Other Information Requests Under Section 704(a)(4) of the FD&C Act
       (Statutorily Authorized RRA)

    In 2012, with the passage of the Food and Drug Administration Safety and Innovation Act to amend
    the FD&C Act, Congress gave FDA the authority to request “any records or other information” in
    advance of or in lieu of an inspection related to human or animal drugs, including human biological
    drug products. Section 704(a)(4) of the FD&C Act requires “a person that owns or operates an
    establishment that is engaged in the manufacture, preparation, propagation, compounding, or
    processing of a drug” to provide FDA, upon request, records or other information that FDA may
    inspect under section 704(a)(1).
    With regards to this compliance program, a 704(a)(4) request may be used in lieu of or in advance of
    a postapproval inspection to support preparation and assessment of product-specific inspection
    coverage. 2 The use of 704(a)(4) authority does not prevent an FDA investigator from requesting
    records or other information on inspection.

    2. Remote Interactive Evaluation (Voluntary RRA)

    A remote interactive evaluation (RIE) is an evaluation of a firm’s compliance with regulations



    1
      See FDA’s An Update to the Resiliency Roadmap for FDA Inspectional Oversight, section 704 of the Federal Food,
    Drug, and Cosmetic Act, and draft guidance for industry Conducting Remote Regulatory Assessments: Questions and
    Answers.
    2
      Staff Manual Guide 9004.1, Policy and Procedures for Requesting Records in Advance of or in Lieu of a Drug
    Inspection.


Date of Issuance: 01/27/2023                                                                              Page 49 of 50

第 50 页

                                                                                 PROGRAM              7356.843


    and/or conformance with an application submission that a firm participates in voluntarily. 3 RIEs are
    defined as FDA’s use of any combination of remote interactive tools (e.g., remote livestreaming
    video of operations, teleconferences, screen sharing) to evaluate facilities where drugs are
    manufactured, processed, packaged, or held. FDA may request to conduct an RIE whenever a
    program office determines it is appropriate based on mission needs.
    With regards to this compliance program, an RIE may be used in lieu of or in advance of a
    postapproval inspection to evaluate marketed drug products manufactured under approved new drug
    applications or abbreviated new drug applications or their associated active pharmaceutical
    ingredients. During an inspection, FDA may collect copies of previously received documents and
    other documents not previously requested.




    3
     See guidance for industry Remote Interactive Evaluations of Drug Manufacturing and Bioresearch Monitoring
    Facilities During the COVID-19 Public Health Emergency.


Date of Issuance: 01/27/2023                                                                             Page 50 of 50

来源:FDA Pharmaceutical Quality Documents · fda.gov