EMA 发布 CHMP 要求的 GCP 检查协调程序 INS-GCP-1 修订版
INS-GCP-1 procedure for coordinating good-clinical-practice inspections requested by the CHMP
EMA 发布 CHMP 要求的 GCP 检查协调程序 INS-GCP-1 修订版(EMA/INS/GCP/55482/2013 – Rev.1),该程序适用于 EMA 和 EU/EEA 检查机构,规定报告检查机构与支持检查机构的指定方式、检查组构成以及各步骤的指示性时间安排,并替代 EMEA/INS/GCP/197225/2005。
PDF 文字版;图形和原始排版请参阅官方 PDF。
第 1 页
17 June 2026
EMA/INS/GCP/55482/2013 – Rev.1
Human Medicines Division
Quality and Safety of Medicines
Procedure for coordinating GCP inspections requested by
the CHMP
GCP Inspectors' Working Group
Applies to: European Medicines Agency, EU/EEA inspection authorities
Adopted by GCP IWG 18 March 2014
Adopted by the CHMP 20 March 2014
Date for coming into effect 20 March 2014
Revision 17 June 2026
This procedure replaces procedure number INS/GCP/1 - EMA document reference number
EMEA/INS/GCP/197225/2005
Keywords GCP inspection, coordination
Official address Domenico Scarlattilaan 6 ● 1083 HS Amsterdam ● The Netherlands
Address for visits and deliveries Refer to www.ema.europa.eu/how-to-find-us
Send us a question Go to www.ema.europa.eu/contact Telephone +31 (0)88 781 6000 An agency of the European Union
© European Medicines Agency, 2026. Reproduction is authorised provided the source is acknowledged.
第 2 页
Table of Contents
1. Summary of scope ................................................................................... 3
2. Introduction ............................................................................................ 3
3. Applicability of this procedure and definition of terms ............................. 4
3.1. NCAs and inspectors to whom this procedure applies .............................................. 4
3.2. Definition of terms ............................................................................................... 4
3.2.1. Inspection procedure ......................................................................................... 4
3.2.2. Site inspection .................................................................................................. 4
3.2.3. Reporting inspectorate ....................................................................................... 4
3.2.4. Reporting inspector ............................................................................................ 4
3.2.5. Lead inspector................................................................................................... 5
3.2.6. Supporting inspectorate ..................................................................................... 5
3.2.7. Supporting inspector .......................................................................................... 5
3.2.8. Trainee inspector ............................................................................................... 5
3.2.9. Observer .......................................................................................................... 5
3.2.10. EMA inspection coordinator ............................................................................... 5
4. Steps of the procedure ............................................................................. 5
4.1. Preparation and adoption of the inspection request ................................................... 5
4.1.1. For-cause inspection .......................................................................................... 5
4.1.2. Routine inspection ............................................................................................. 6
4.1.3. Integrated inspection report target date ............................................................... 6
4.2. Designation of inspectorates .................................................................................. 6
4.2.1. Designation of the reporting inspectorate .............................................................. 7
4.2.2. Designation of the supporting inspectorate ........................................................... 7
4.3. Designation of the inspection team ......................................................................... 7
4.3.1. Trainee inspectors ............................................................................................. 8
4.4. Communication of the inspection request ................................................................. 8
4.5. Inspection procedure preparation ........................................................................... 8
4.5.1. Technical preparation ......................................................................................... 8
4.5.2. Coordination of travel and accommodation arrangements ........................................ 9
4.6. Site inspection ..................................................................................................... 9
4.7. Inspection reporting .............................................................................................. 9
4.8. Further consultations and CHMP opinion .................................................................. 9
4.9. Record keeping and archiving ................................................................................ 9
5. Appendices ............................................................................................ 10
5.1. Appendix 1: Process maps for the designation of inspectorates and inspectors involved 10
5.1.1. Process Map: Decision tree for the selection of the reporting inspectorate.................. 10
5.1.2. Process Map: Decision tree for the selection of lead inspectors for GCP inspections in
EU/EEA countries ...................................................................................................... 11
5.1.3. Process Map: Decision tree for the selection of lead inspectors for GCP inspections in
third countries .......................................................................................................... 11
5.2. Appendix 2: Process steps and their projected time intervals. ................................... 12
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 2/13
第 3 页
1. Summary of scope
This procedure describes the coordination process of Good Clinical Practice (GCP) inspections
requested by the Committee for Medicinal Products for Human Use (CHMP), with a particular focus on
the roles of National Competent Authorities (NCA) of the Member States (MS) and European Medicines
Agency (EMA).
2. Introduction
Only GCP inspections requested by the CHMP are detailed in this procedure.
The legal basis for GCP inspections of medicinal products for which a marketing authorisation
application (MAA) has been submitted to the Agency, is found in article 57(a)(i) of Regulation
(EC) No. 726/2004. This provides that the Agency shall, within its Committees, undertake the
following tasks:
• coordination of the scientific evaluation of the quality, safety and efficacy of medicinal
products which are subject to EU marketing authorisation procedures;
• coordination of the verification of compliance with the principles of good manufacturing
practice, good laboratory practice and good clinical practice and the verification of compliance
with pharmacovigilance obligations.
One of the criteria for making a decision on an MAA is the assessment of the submitted clinical
documentation. According to the introduction and general principles of Annex 1 of Directive
2001/83/EC, all clinical trials included in an EU MAA are required to follow principles equivalent to
the provisions of the relevant EU legislation on clinical trials. Therefore, the assessment of clinical
documentation may lead to a request for a GCP inspection.
Any clinical trial included in the MAA could be subject to inspection. This could be a for-cause or
routine inspection. The objective of a GCP inspection requested by the CHMP is to:
• determine whether the trial was conducted in accordance with applicable regulatory
requirements, which include local regulations and ethical standards, ICH E6, and Directive
2001/83/EC;
• provide answers to questions arising from the MAA assessment process where it has been
determined that these can best be provided through inspection;
• determine whether the data submitted in the dossier is credible and accurate.
Routine inspections are carried out as a routine surveillance of GCP compliance, in the absence of
specific concerns. Applications, trials and sites for routine inspections are, however, selected based
on a set of criteria to ensure that a range of different situations are covered, and that inspection
resources are used efficiently. Routine inspections are usually requested early (at the beginning of
the procedure in case of an accelerated procedure, and, in a standard procedure, on day 30 or at
the latest day 60) in the assessment procedure and before the adoption of the List of Questions.
A for-cause inspection is requested when a concern arises during the evaluation of the MAA. For-
cause inspections can be triggered at any time during the MAA review. For details on the selection
of applications for routine inspections as well as for-cause inspections, refer to the 'Points to
consider for assessors, inspectors and European Medicines Agency inspection coordinators on the
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 3/13
第 4 页
identification of triggers for the selection of applications for routine and for-cause inspections, their
investigation and scope of such inspections' 1.
3. Applicability of this procedure and definition of terms
3.1. NCAs and inspectors to whom this procedure applies
For the purposes of this procedure, NCAs involved may be:
• from the same country as the CHMP rapporteurs;
• from the EU/EEA countries where the sites to be inspected are located;
• from other EU/EEA countries if needed.
The inspectors performing the tasks and duties described in this procedure are appointed by the
NCAs involved.
In accordance with Article 11 of the Commission Implementing Regulation (EU) 2017/556,
the inspections shall be carried out on behalf of the Community and the results shall be recognised
by all the other MSs.
3.2. Definition of terms
3.2.1. Inspection procedure
An inspection procedure is an umbrella term to describe a number of individual inspections that
culminate in the delivery of an integrated inspection report (IIR). The IIR summarises the findings
across all individual site inspections.
3.2.2. Site inspection
A site inspection is an individual inspection of a distinct component of a clinical trial. This takes place
at a distinct location where trial activities are conducted (e.g. hospital, sponsor or service provider)
but can also include a dedicated department within a larger facility. The results of each site
inspection are documented in a dedicated inspection report (IR).
3.2.3. Reporting inspectorate
The reporting inspectorate is the NCA from an EU/EEA member state, which takes the responsibility
for organising, planning and reporting the GCP inspection procedure and for designating the
reporting inspector for the requested inspection procedure.
3.2.4. Reporting inspector
The reporting inspector (RI) is designated by the reporting inspectorate. The role of the RI is to
coordinate the preparation, conduct and reporting of the inspection procedure. The RI acts as the
main communication point between the inspection team and the EMA Inspections Office, the
rapporteurs and the CHMP. The RI is responsible for preparing the IIR summarising the outcome of
the site inspections within the procedure. The responsibilities of the RI are described in INS-GCP-
2.
1 Points to consider for the selection of applications for inspection
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 4/13
第 5 页
The RI may also be the lead inspector (see below) or supporting inspector for one or more site
inspections.
3.2.5. Lead inspector
The lead inspector (LI) is responsible for the conduct and reporting, including the IR, of one or more
site inspections in the procedure as agreed with the RI. The responsibilities of the LI are described in
procedure INS-GCP-2.
3.2.6. Supporting inspectorate
The supporting inspectorate is the NCA from an EU/EEA member state that works alongside the
reporting inspectorate in the conduct of an inspection procedure. Inspectors from the supporting
inspectorate may act as LI for one or more site inspections in the procedure, as agreed with the RI.
3.2.7. Supporting inspector
The supporting inspector is designated by the supporting inspectorate to participate in the conduct
of one or more inspections in the procedure. The RI may also be a supporting inspector in one or
more site inspections.
3.2.8. Trainee inspector
Inspectors in training may participate in the inspection procedure as trainees to gain the necessary
experience in accordance with Article 4 of Commission Implementing Regulation (EU)
2017/556. MSs shall ensure that trainees are bound by the same confidentiality rules as
inspectors, and that they are aware of the applicable rules as regards confidentiality and the
protection of personal data.
3.2.9. Observer
Local inspectorate or other officials of the union may observe an inspection.
3.2.10. EMA inspection coordinator
An EMA inspection coordinator is assigned to support the organisation of the inspection and to act as
the communication point in the EMA Inspections Office.
4. Steps of the procedure
The inspection is integrated into the MAA assessment process. Appendix 1 contains process maps
illustrating the designation of the reporting inspectorate and lead inspectors. Appendix 2 contains a
tabular presentation of the time intervals involved in the different steps of the inspection process.
4.1. Preparation and adoption of the inspection request
4.1.1. For-cause inspection
To request a for-cause GCP inspection, the assessor identifying the need for the inspection should
contact the GCP inspectors within their NCA as well as the Product Lead (PL) and EMA Inspections
Office. The selection of sites to be inspected and the determination of the scope of the inspection
are based on the concerns identified in the application and the inspection request is prepared
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 5/13
第 6 页
collaboratively between the rapporteurs (and their assessors), and the EMA Inspections Office. The
selection of sites and the scope of the inspection may be further refined through discussion with the
potential inspectorates/inspectors. The GCP concerns and inspection request are reflected in the
assessment report by the rapporteurs.
The inspection request should clearly state the grounds and scope of the inspection procedure, the
site(s) and, if applicable, a list of specific questions to be addressed during the inspection as well as
any other issues relevant to the inspection. Where the CHMP considers that a GCP inspection is
appropriate, the CHMP adopts the request.
4.1.2. Routine inspection
The applications, trials, and sites to be inspected as well as the scope of the inspection procedure
are proposed by the EMA Inspections Office. A list of applications validated in the previous two
months is sent to the NCAs to receive their potential input into the selection of applications for
routine inspection. The draft proposal for a routine inspection procedure is circulated to the NCAs for
confirmation of resources in the week before the CHMP meeting. The NCAs are given an opportunity
to comment on the inspection request prior to its finalisation and adoption by the CHMP.
The GCP inspection request is reflected in the Day 80 assessment report by the rapporteurs.
4.1.3. Integrated inspection report target date
The target date for the provision of the IIR is set out in the inspection request. For routine
inspection procedures the target date is usually two weeks before Day 150 at the latest. Meeting the
target date will sometimes not be possible, especially in case of for cause inspections. In all cases,
the final IIR should be available in time to be addressed in the response to the Day-180 list of
outstanding issues (LoOI).
4.2. Designation of inspectorates
Designation of the inspectorates is done in parallel with the preparation of the inspection request for
CHMP adoption. A contact point for the purpose of deciding an inspectorate's availability to perform
an inspection is appointed by each NCA and notified to the Agency. The proposal for an inspection
procedure is sent by the EMA Inspections Office simultaneously to each NCA contact person for
information and an indication of availability to participate in the inspection procedure is requested.
The NCAs are expected to respond to the request for availability as soon as possible and no later
than the last day of the CHMP meeting, to allow for the finalisation of the inspection request for
adoption.
When it is not feasible for an inspectorate to carry out the requested parts of the inspection
procedure, the NCA may ask, in coordination with the EMA, another inspectorate to conduct or assist
in the inspection (in accordance with Article 9(4) and 10(8) of Commission Implementing
Regulation (EU) 2017/556).
There are normally two MSs involved in an inspection procedure (reporting inspectorate and supporting
inspectorate). Adding an additional supporting inspectorate from a third MS is possible if needed to
ensure sufficient resources and expertise within the inspection team. Appointing more than two
inspectorates does not affect the fees paid by the applicant. If in exceptional circumstances there is a
need to designate only one inspectorate for an inspection procedure, this must be justified and
documented.
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 6/13
第 7 页
4.2.1. Designation of the reporting inspectorate
For routine GCP inspection procedures, the reporting inspectorate will be designated by the EMA
Inspections Office according to the following sequence, subject to the availability of inspector(s), or
unless otherwise agreed:
• Inspectorate from the rapporteur or co-rapporteur MS;
• Inspectorate from other EU/EEA MS.
In the case of 'for-cause' inspections, the RI should come from the inspectorate of the rapporteur or
co-rapporteur country.
The reporting inspectorate should preferably participate in all site inspections. If this is not possible the
reporting inspectorate should participate in at least one site inspection with the agreement of the
inspection team.
4.2.2. Designation of the supporting inspectorate
The supporting inspectorate is designated in the same sequence as the reporting inspectorate. If the
site where the inspection is planned to take place is within an EU MS, that MS is asked to take on the
role of supporting inspectorate. (See decision tree in appendix.)
4.3. Designation of the inspection team
Each inspectorate should designate at least one appropriately qualified inspector (in accordance with
(EU) 2017/556 Article 4) to be part of the inspection team. The MSs are responsible for ensuring
that the qualifications, experience, and training of the inspectors fulfill the requirements of Article 4
of Commission Implementing Regulation (EU) 2017/556, and that there are no conflicts of
interest (Article 5 of the same regulation). EMA checks the Declaration of Interests (DoI) of
inspectors involved in inspection procedures related to the centralised procedure, according to EMA
policy.
The roles in the inspection team shall be decided in accordance with the decision tree in the
appendices or agreed with the inspection team. The RI is responsible for informing the EMA about
the roles (LI, supporting inspector) of inspectors at each site. For each selected site, one LI should
be designated (this may be the same or different inspectors for the different sites selected). The
composition of the inspection team should take the below principles into account.
• Inspections at each site will normally be conducted by inspectors from two different MSs.
However, upon agreement among the concerned NCAs and the EMA Inspections Office, inspections
could be carried out, under exceptional circumstances, only by inspectors from one MS. Justification
for only one MS must be documented.
• The inspection team should consist of an adequate number of inspectors and necessary expertise
to conduct the inspection procedure. Inspection teams are typically composed of two to three
inspectors per site, unless additional inspectors are justified (e.g. in case of a complex trial, large
number of trial participants, large amount of data, inspection of sponsor’s activities, systems or
aspects requiring specific expertise or experience, and in the case of a for-cause inspection).
• The RI, taking into consideration the appropriate use of inspection resources and the appropriate
conduct of the inspection procedure, should consider the composition of the inspection team at each
site. Rationale for the team composition should be documented and well-justified in case of large
inspection teams. The RI should liaise with the inspectors in the inspection team and the EMA
Inspections Office to agree on the composition of the inspection team at each site prior to
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 7/13
第 8 页
announcing the inspection to the sites. EMA collaborates with the MSs to promote the efficient use of
inspection resources.
4.3.1. Trainee inspectors
When the LI considers there is room to involve another inspector from his/her MS or a different MS
for training purposes, this inspector will act as a trainee inspector. Such trainee participation will not
give rise to a share of the inspection fee. The travel expenses of the trainee will not be covered by
the applicant. The trainee inspector will act as a member of the inspection team and should be
granted access to the inspected documents, data and premises, similarly to inspectors. The same
rules for confidentiality and DoI will apply for the trainee inspector as for other inspectors. Note:
This does not preclude sufficiently qualified inspectors (per Article 4 of the Commission
Implementing Regulation EU 2017/556), using the inspection as an opportunity to further
develop in more complex areas in the role as a supporting inspector, provided they contribute to
inspection activities within their competence as inspectors.
4.4. Communication of the inspection request
After the confirmation of resources for the inspection procedure, the EMA inspection coordinator
opens an inspection case in IRIS 2 and enters the details of the inspection as well as the IIR target
date. A notification is sent from IRIS to the Product Lead (PL), rapporteurs and inspectors for them
to review the case. After adoption by the CHMP, the inspection coordinator confirms the adoption of
the inspection to the rapporteurs, the PL, and the concerned inspectors in IRIS. Simultaneously, the
inspection is announced by the EMA Inspections Office via a separate IRIS notification to the
applicant.
In the inspection announcement from the EMA, the applicant is requested to confirm in writing that
the sites accept to be inspected in line with the Guidance for applicants/MAHs involved in GMP,
GCP and GVP inspections coordinated by EMA. The applicant should liaise with the RI prior to
providing the documents to ensure alignment on the appropriate format and content. The EMA
Inspections Office facilitates communication between the inspection team and the applicant.
EMA will contact local authorities in third countries as appropriate.
Any change to the inspection request must be justified, approved by the EMA Inspections Office and
adopted by the CHMP. Changes are communicated to the applicant by the EMA inspection
coordinator.
4.5. Inspection procedure preparation
Once the inspectorates and the inspection team have been assigned, the preparation for the inspection
procedure begins in accordance with INS-GCP-2.
4.5.1. Technical preparation
The technical preparation of the inspection procedure is detailed in a separate procedure (refer to INS-
GCP-2).
2 EMA's regulatory and scientific information-management platform
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 8/13
第 9 页
4.5.2. Coordination of travel and accommodation arrangements
The inspectors make contact directly with the applicant, who is asked to facilitate the inspectors' travel
and accommodation arrangements, as per the inspectors' national procedures.
4.6. Site inspection
The conduct of the inspections is described in a separate document (refer to INS-GCP-3) with
appendices by type of site.
4.7. Inspection reporting
The preparation of inspection reports is detailed in a separate procedure (INS-GCP-4).
Following the site inspections, in cases where issues are identified that require further follow-up or
that could significantly affect the rights, safety and wellbeing of patients or the credibility of the data,
the RI should submit a preliminary outcome report to the rapporteurs. Communication between the
RI and the rapporteurs should take place with support from the EMA Inspections Office.
For each inspected site, the LI prepares an IR. The RI is responsible for preparing the IIR and uploading
it in IRIS.
The EMA inspection coordinator validates the IIR. In case any correction is required, the coordinator
contacts the RI. After successful validation, the inspection coordinator makes the report available (via
IRIS) to the rapporteurs and CHMP, and thereafter the applicant.
4.8. Further consultations and CHMP opinion
In the case of inspection findings with potential impact on the MAA assessment, the RI and/or relevant
members of the inspection team should be available, as necessary to interact with the assessors and the
CHMP to facilitate the resolution of the issues in the context of the assessment procedure.
The EMA Inspections Office facilitates the assessment of the impact of findings on the application and
together with the PL ensures that the European Public Assessment Report includes information on the
GCP inspections as applicable.
4.9. Record keeping and archiving
The EMA inspection coordinator is responsible for managing and archiving the inspection in IRIS,
including relevant communication.
The RI and LI are responsible for maintaining and archiving the local and central inspection files in
accordance with appendix VI of INS-GCP-3, as well as recording the required inspection information in
CTIS as applicable.
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 9/13
第 10 页
5. Appendices
5.1. Appendix 1: Process maps for the designation of inspectorates and
inspectors involved
• Reporting inspectorate.
• Lead inspectors (sites in EU/EEA countries).
• Lead inspectors (sites in third countries).
5.1.1. Process Map: Decision tree for the selection of the reporting
inspectorate
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 10/13
第 11 页
5.1.2. Process Map: Decision tree for the selection of lead inspectors for GCP
inspections in EU/EEA countries
5.1.3. Process Map: Decision tree for the selection of lead inspectors for GCP
inspections in third countries
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 11/13
第 12 页
5.2. Appendix 2: Process steps and their projected time intervals.
Table of process steps and their projected time intervals.
Table 1. Activities related to GCP inspections requested by CHMP: indicative* time schedule
STEPS OF THE PROCEDURE TIME ALLOWED
1. Early activities of EMA Inspections To be determined by the EMA Inspections
Office/CHMP: Office/CHMP
• request for a GCP inspection procedure;
• initial selection of sites;
• set up of overall time schedule;
• designation of the reporting and supporting
inspectorates;
• first contacts between EMA Inspections
Office and inspectorates concerned;
• notification of the inspection to applicant. Notify reporting inspectorate and other
inspectorate(ies) within 10 working days of
CHMP meeting.
Notify applicant and request necessary
documents for inspection procedure preparation
within 10 working days of CHMP meeting.
Applicant to respond within 10 working days of
the announcement of the inspection procedure,
or otherwise agreed with the reporting inspector.
2. Inspection procedure preparation: [20] days* after the delivery of the documents
requested from the applicant to the inspectorates.
• notification/announcement of site
inspections;
• preparation of the inspection plan;
• obtaining and reviewing required documents;
• finalisation of travel arrangements with the
applicant.
3. Site inspection [30] days*
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 12/13
第 13 页
STEPS OF THE PROCEDURE TIME ALLOWED
4. Writing and circulation of the reports:
• writing of the inspection report;
• responses from the inspectee/party(-ies)
[15] days*
responsible;
• writing addendum of the inspection report – [15] days*
evaluation of responses;
• writing of the IIR and transmission to EMA
Inspections Office/CHMP. [10] days*
[10] days*
Total: [50] days*
5. Validation of the IIR by the EMA [5] days*
Inspections Office for adherence to
applicable reference texts and procedures
Note: the numbers in brackets refer to calendar days
* Times allowed to complete each step of the initiation, conduct and termination of the
inspection are provided in this table. These times, shown in square brackets, should be considered
as indications and can be modified if necessary.
Procedure for coordinating GCP inspections requested by the CHMP
EMA/INS/GCP/55482/2013 – Rev.1
Page 13/13
来源:EMA 官方医药监管信息 · ema.europa.eu