欧盟委员会发布集中审批产品GMP检查协调指南第3版,2026年9月10日生效

Co-ordinating good manufacturing practice (GMP) inspections for centrally authorised products

AI 导读

欧盟委员会发布集中审批产品GMP检查协调指南第3版,用于协调EMA为集中审批产品要求的GMP检查。文件2026年4月通过、2026年9月10日生效,取代2025年1月通过的第2.0版。此次修订主要为澄清在无需支持机构时开展检查的安排,并调整目录等编辑内容,指南涵盖检查触发、牵头与支持机构确定、检查准备及最终报告提交EMA等流程。

正文 · 原文

PDF 文字版;图形和原始排版请参阅官方 PDF。

第 1 页

                       EUROPEAN COMMISSION
                       HEALTH AND FOOD SAFETY DIRECTORATE-GENERAL

                       Health systems, medical products and innovation
                       Medical products: quality, safety, innovation




Co-ordinating GMP inspections for centrally authorised
products

Table of contents:
1. Introduction
2. Scope
3. Legal basis
4. General procedure for GMP inspection
5. Pre-submission notification by the applicant for a marketing authorisation
6. Triggers for inspections
7. Identification of Leading and Supporting Authorities
8. Preparation of inspections
9. Contacts with the applicant and the manufacturer(s) to be inspected
10. Submission of the final report to the EMA




Title                        Coordinating GMP inspections for centrally authorised products

Date of adoption             April 2026

Date of entry into           10 September 2026
force

Supersedes                   Version 2.0 adopted January 2025

Reason for revision          Minor amendments made for clarification purposes with regard to the conduct
                              of inspections without the need of a Supporting Authority. Minor editorial
                              changes were made to the table of contents.

Notes                        Not applicable

Last publication date:

Document version             3

第 2 页

Co-ordinating GMP inspections for centrally authorised
products
1.    Introduction
This guideline should be read in conjunction with the terms of the standard contract between the
European Medicines Agency (EMA) and the Competent Authorities of the EU Member States.



2.    Scope
For GMP inspections carried out by Competent Authorities of the Member States of the European
Economic Area (EEA) at the request of the EMA.



3.    Legal basis
In order to complete the assessment of applications for marketing authorisations under the centralised
system, the Committee for Medicinal Products for Human Use (CHMP) or the Committee for Veterinary
Medicinal Products (CVMP) may request that an inspection is carried out of the manufacturing site for a
medicinal product in accordance with Articles 8 (2) of Regulation (EC) No 726/2004 of the and 94 (4)
of Regulation (EU) 2019/6.

Repeated (routine re-inspections) may also be requested according to the provisions of Articles 19 (3)
of Regulation (EC) No 726/2004 and 94 (4) and 123 (4) of Regulation (EU) 2019/6.



4.    General procedure for GMP inspection
4.1   Inspections coordinated by the EMA are managed using the IRIS application.

4.2   Inspection reports will be prepared by the inspectors of the appointed Authorities of the Member
      State for all inspections requested by either the CHMP or CVMP.

4.3   The inspectors of the appointed Authorities may be assisted in the preparation of the report by
      experts appointed by either the CHMP or CVMP to take part in the inspection.

4.4   The EMA requires the inspection report to be in English.

4.5   The content and format of the report should be that described in the Compilation of Union
      procedures.

4.6   The report should address any questions raised by the Rapporteur/Co-Rapporteur relating to the
      assessment of the manufacturing activities and/or control procedures or any other specific issues
      identified by the CHMP or the CVMP and/or the EMA (e.g. reported problems, quality defects) as
      relevant.

4.7   The inspection report should be finalised and sent to the EMA signed by all participating
      inspectors within the timelines identified in the relevant inspection request (i.e. Reporting
      deadline).

4.8   The EMA will check the inspection reports received for adherence to this guideline and for their
      scientific content and overall quality. Reports, that in the opinion of the Agency are found to be
      deficient, incomplete or below the required scientific standard, will be returned to the Authorities
      responsible for their preparation with a written explanation of the reasons for non-acceptance
      and proposed deadline for revision, re-inspection or other remedial action. For pre-approval
      inspections this deadline will take account of the overall timetable adopted for completion of the
      assessment of the application.

第 3 页

5.    Pre-submission notification by the applicant for a marketing
      authorisation
In their notification of intention to submit, applicants should mention the name (including contact
point) and the address of the proposed manufacturers of the active substance(s) and finished product
including the site(s) in the EEA responsible for batch release of the medicinal product. If necessary, a
flowchart should be provided to illustrate the role of all different sites involved. All sites listed in
applications should be ready for inspection from the time of submission of the application and be in
compliance with EU (or equivalent) Good Manufacturing Practice (GMP).



6.    Triggers for inspections
Pre-approval inspections

The EMA validates submissions (new marketing authorisation applications, line extensions and
variations) to the centralised system and determines whether or not an inspection of the
manufacturing, control, batch release and importation site(s) concerned is needed to verify compliance
with GMP before a marketing authorisation or a variation can be granted. A decision is made in
collaboration with the Supervisory Authority (SA) and the (co)Rapporteur whether or not to ask the
relevant committee to adopt a request for a pre-approval inspection. Such inspections are identified
at the stage of the validation of the marketing authorisation or at receipt of the D70/D80 assessment
reports, and need to be requested for adoption by the Committee latest by day 90. The inspection will
include, but not be limited to any specific aspects of the application, that the (co)rapporteur raises in
the day 70/80 assessment report(s), or analogous time point for variations/line extensions.

Routine re-inspections

Once a site is registered in the dossier of a Centrally Authorised Product (CAP), via new marketing
authorisation application, line extension or variation, the EMA ensures that manufacturing sites listed in
centralised marketing authorisations that are located in third countries are routinely re-inspected in
accordance with the inspection frequencies and risk based approach laid down in the Compilation of
Union Procedures in order to verify on-going GMP compliance unless an MRA or equivalent agreement
is in force. Re-inspection of sites located in the EEA or in countries where an MRA or equivalent
agreement is in force is left under the responsibility of the relevant National Competent Authorities or
MRA partner.




7.    Identification of Leading and Supporting Authorities
The Leading and Supporting Authorities that will form the inspection teams for EMA pre-approval, for
cause and routine re-inspections will be identified taking into account the principles described in this
chapter.


The Leading Authority is usually the Supervisory Authority (SA) for one or more products included in
the inspection. When there is more than one Supervisory Authority for a specific site, the Leading
Authority will be identified based on the number of products (to be included in the respective
inspection) that each Supervisory Authority is responsible for, as well as the Authority performing the
previous inspections (for centrally and/or national products), for consistency and continuity.


The Supporting Authority, if one is necessary, will be one of the other Supervisory Authorities for other
products included in the inspection, considering also the Authority that performed the previous
inspection (if not a SA) or one of the SA for the products manufactured/tested in the site.


Should none of the Supervisory Authorities for the products included in the inspection be able to

第 4 页

perform the inspection at issue within the timelines required, EMA will request other Competent
Authorities to carry out the inspection in line with the Union Procedure on delegation of
responsibilities, through a call for expression of interest or in case of pre-approval inspections by
requesting the conduct of said inspection to the inspectors from the national Competent Authority of
the countries of the relevant Rapporteur and Co-Rapporteur.


In proposing Leading and Supporting Authorities, it will be ensured that there is an adequate
distribution of the workload among the Member States (i. e. Supervisory Authorities) and consistency
and continuity for the inspected sites. In the spirit of promoting cooperation and knowledge sharing,
EMA will actively promote joint inspections as part of its GMP inspections programme while the EU/EEA
pharmaceutical inspectorates shall cooperate with the Agency in line with Article 111 of Directive
2001/83/EC and with each other in line with Article 137 (3) of Regulation (EU) 2019/6 and are
strongly encouraged to use the EudraGMDP planning module to identify suitable opportunities for joint
inspections of third country sites.


Where appropriate, alternating Leading and Supporting Authority roles between the Supervisory
Authorities for an inspection should be considered, for consistency.


However, acknowledging that for some sites it may not be necessary to have a Supporting Authority
(e.g. some quality control labs, very small manufacturing sites, sites with only one Supervisory
Authority for CAPs, etc), the respective inspection can be conducted by only one Authority who will act
as Leading and Supporting Authority agreeing to take on the additional exceptional workload and
related costs incurred by the inspection.


The EMA Annual Re-inspection Programme of routine inspections, EMA will prepare the
programme of inspections of the registered third country sites for CAPs to be adopted by the GMDP
IWG. In the draft annual programme, Leading and Supporting Authorities will be proposed for each
inspection taking into consideration the inspection history of the site, the complexity of the
site/inspection and ensuring adequate distribution of workload. The inspections, including the Leading
and Supporting Authorities, should be agreed at an early stage for better planning (twelve months
before the end of the reporting deadline, but at least nine months in advance). The Competent
Authorities are expected to provide feedback on the EMA annual re-inspection programme during the
consultation period in the margins of the IWG meetings, unless otherwise specified, which includes
feedback on the proposed Leading and Supporting Authorities and whether a Supporting Authority is
necessary or not for a specific inspection, or opportunities for collaboration between Authorities on
specific inspections.



Pre-approval or for-cause inspections, are usually triggered outside of the re-inspection
programme described above, and EMA will first identify the Leading Authority, and then request the
Leading Authority to assess the inspection request and confirm whether a Supporting Authority is
necessary. When a Supporting Authority is not necessary, the single Authority will act as Leading and
Supporting Authority. Considering the short time frame to conduct and report pre-approval inspections
for CAPs (usually between D80 and D121 of the marketing authorisation assessment procedure), the
team composition must be determined as early as possible. Volunteers for a call for expression for pre-
approval inspections should be provided within 14 days, unless otherwise specified.


8.    Preparation of inspections
Following the designation of the Leading and Supporting Authorities for any inspection, together with
the details of the inspections and reporting deadline will be requested for adoption by the CHMP and/or
CVMP.

第 5 页

The National Competent Authorities participating in an adopted inspection request will nominate the
inspectors who will carry out the inspection and inform the EMA by e-mail (i.e. by responding to the
notification e-mail of the announcement of the inspection that is sent from IRIS) including the role
(leading/supporting inspector) of each of the inspectors as soon as this information becomes
available. The National Competent Authority shall ensure that inspectors are trained and are included
in the list of EMA experts Database Tool before making the nominations. EMA will check the status of
the experts’ nomination documentation (i.e. Declaration of Interests) before accepting the
nominations. Once this check is performed, the EMA will add the inspectors to the case in the IRIS
system.



9.    Contacts with the applicant and the manufacturer(s) to be
      inspected

Once the Committee has requested an inspection, the EMA notifies the applicant/MAH that an
inspection will take place, giving details of the National Competent Authorities that will conduct the
inspection and indicates the inspection fees expected to be paid once the final inspection report is
received by EMA.

Remuneration of inspections will be paid by EMA in accordance with Regulation (EU) 2024/568 and
associated working arrangements on fees and charges payable to the European Medicines Agency
applicable from 1 January 2025.

Travel expenses are paid directly to the inspectorates by the applicant/MAH in accordance with point
1.4 of Annex IV to Regulation (EU) 2024/568.

EMA should be informed of the planned dates for inspection agreed between the appointed Authorities
(including the lead and supporting role of each) and of any changes in these dates, if applicable, as
soon as they are scheduled. An inspection is considered scheduled once the specific dates have been
confirmed by the inspecting NCAs and provided to the EMA. When more than 1 inspectorate are
performing the inspection, the dates need to be agreed between the inspectors first as soon as
possible, before EMA is informed.

The Leading and Supporting Authorities will make the arrangements directly with the manufacturer
and, once appropriate (closer to the inspection date), announce the inspection dates to the site. In
preparation of the inspection, the manufacturer(s) or the applicant/MAH may be asked to provide
information about the site and operations to be inspected (this is normally provided in a “Site Master
File”). The applicant may be requested to supply a copy of relevant parts of the dossier to the
inspection team.

In the case of third country inspections, the inspecting Authorities should notify the local Competent
Authority.

Prior to the inspection, EMA will draw the attention to the inspection team of any specific issues that
have been identified for inspection follow up for example arising from the assessment of any regulatory
submission (e.g. new marketing authorisation application, line extension or variation), from the last
inspection, sampling and testing or quality defect investigations by e-mail or via the IRIS system (i.e.
field “notes to inspectors”).



10. Submission of the final report to the EMA
Following the finalization of the inspection report, the inspecting Authorities’ team shall send their
report to the EMA (by uploading the signed report and the Appendix 1 in the case folder of the
corresponding case via IRIS Network Portal). EMA will validate the inspection report in accordance
with the ‘’GMP inspection report- Union format’’ as per Compilation of Union procedures on

第 6 页

inspections and exchange of information, and raise any issue identified with the inspecting
Authorities, if needed. Once the inspection report validation has been completed by EMA, the
payment process for the Authorities will be initiated.

The Leading Authority for the inspection is responsible for the issue of GMP certificates or statements
of non-compliance in line with Union legislation and to update the EudraGMDP database accordingly.

来源:EMA 官方医药监管信息 · ema.europa.eu