VDI 发布洁净室指南 VDI 2083 第 4.1 与 4.2 分册更新草案并征求意见
VDI updates Cleanroom Guidelines 2083 Sheets 4.1 and 4.2
VDI(德国工程师协会)更新了 VDI 2083 系列的两份指南并发布征求意见,意见截止日为 2025 年 12 月 31 日。第 4.1 分册现行版本为 2006 年 10 月,新版由 48 页增至 70 页,涉及洁净室规划、建造与初次调试。第 4.2 分册现行版本为 2011 年,新版由 59 页减至 47 页,聚焦洁净室节能潜力,两份草案均可从 DIN Media 获取。
The Verein Deutscher Ingenieure (VDI) has updated two guidelines from the VDI 2083 series and published them for comment. VDI 2083 4.1 describes the planning, construction and initial commissioning of cleanrooms, while VDI 2083 4.2 covers the energy efficiency of cleanrooms. VDI 2083 4.1 – Planning, construction and initial commissioning of cleanroomsthe current version of Sheet 4.1 dates from October 2006. The new version has grown from 48 to 70 pages and describes the life cycle of cleanrooms as investment projects with a focus on cleanroom-specific aspects. The systematic approach described includes the detailed recording of user requirements with risk analysis, planning preparation and the implementation of the individual planning stages, initial commissioning and training of the personnel involved. The necessary documentation in the individual project phases is also described.The table of contents of the new VDI 2083 Sheet 4.1 guideline is freely available. The draft itself can be obtained from DIN Media.The comment period runs until 31 December 2025.VDI 2083 4.2 - Cleanroom technology – Energy efficiencyVDI 2083 Sheet 4.2 is currently from 2011. The new version has changed from 59 to 47 pages. The new version of VDI 2083 Sheet 4.2 focuses on cleanroom-specific energy saving potential. It provides recommendations for minimising energy consumption in new and existing clean areas, including the associated ventilation and air conditioning technology. It is applicable to the design, construction, commissioning and operation of cleanrooms. The scope covers the electronics, aerospace, nuclear, pharmaceutical, hospital, medical device and food industries. Here you will find the table of contents of the new draft VDI 2083 Sheet 4.2. Comments can also be submitted until 31 December 2025. The draft can also be purchased from DIN Media.
来源:ECA GMP News · gmp-compliance.org