跳到正文
FDA 官方药品与生物制品信息·AI 评分34

FDA MAPP 5001.1:CBE补充申请收到完整回复函后的药品分销政策

MAPP 5001.1 Drug Product Distribution After a Complete Response Action to a Changes Being Effected Supplement

AI 导读

FDA发布MAPP 5001.1,规定CBE补充申请收到完整回复函(CR)后药品分销的政策与程序,适用于OPQ、OND和OGD管理的NDA、ANDA及BLA补充申请。除非FDA发出停止分销令,申请人可继续销售使用CBE补充申请所述变更生产的药品;若FDA认定继续销售可能危害公众健康或安全有效性存疑,可下令停止分销。该文件生效日期为2017年10月4日。

正文 · 原文

PDF 文字版;图形和原始排版请参阅官方 PDF。

第 1 页

MANUAL OF POLICIES AND PROCEDURES

CENTER FOR DRUG EVALUATION AND RESEARCH                                                                        MAPP 5001.1


                                     POLICY AND PROCEDURES

                         OFFICE OF PHARMACEUTICAL QUALITY

                          Drug Product Distribution After a
            Complete Response Action to a Changes Being Effected Supplement


                                                Table of Contents

                   PURPOSE ..............................................................................1
                   BACKGROUND ...................................................................1
                   POLICY .................................................................................2
                   RESPONSIBILITIES ...........................................................4
                   PROCEDURES .....................................................................4
                   REFERENCE ........................................................................6
                   EFFECTIVE DATE ..............................................................6
                   CHANGE CONTROL TABLE............................................6

PURPOSE

This MAPP describes the policies and procedures for the Food and Drug Administration
(FDA) to follow when assessing an applicant’s distribution of a drug product
manufactured using a change that the applicant had described in a Changes Being
Effected (CBE) supplement to which FDA issued a complete response (CR) letter. This
MAPP applies to CBE supplements that are submitted to a new drug application, an
abbreviated new drug application, or a biologics license application managed by the
Office of Pharmaceutical Quality (OPQ), the Office of New Drugs (OND), or the Office
of Generic Drugs (OGD).


BACKGROUND

Under 21 CFR 314.70(c), an applicant is required to submit a supplement:

           for any change in a drug substance, drug product, production process,
           quality controls, equipment, or facilities that has a moderate potential to
           have an adverse effect on the identity, strength, quality, purity, or potency
           of the drug product as these factors may relate to the safety or
           effectiveness of the drug product. 1




1
    See also 21 CFR 601.12(c).

Originating Office: Office of Policy for Pharmaceutical Quality
Effective Date: 10/4/17                                                                                          Page 1 of 6

第 2 页

MANUAL OF POLICIES AND PROCEDURES

CENTER FOR DRUG EVALUATION AND RESEARCH                                          MAPP 5001.1

Section 314.70(c) provides for two types of supplements for such changes — that is, a
Changes Being Effected in 30 Days (CBE-30) supplement and a Changes Being Effected
(CBE-0) supplement.

Under §§ 314.70(c)(5) and 601.12(c)(4), an applicant must not distribute a previously
approved drug product that is being manufactured using a change proposed in a CBE-30
supplement if, within 30 days following FDA’s receipt of that supplement, FDA informs
the applicant either that (1) a prior approval supplement is required or (2) any of the
information required under § 314.70(c)(4) or § 601.12(c)(3) is missing from the
supplement. In the second situation, the applicant must not distribute the drug product
manufactured using the change until the CBE-30 supplement has been amended to
provide the missing information.

Under §§ 314.70(c)(6) and 601.12(c)(5), an applicant may commence distribution of a
drug product manufactured using a change proposed in a CBE-0 supplement after FDA
receives that supplement.

FDA may issue a CR letter to the CBE-0 or CBE-30 supplement (21 CFR 314.110(a) and
21 CFR 601.3(a)). On or after the issuance of a CR letter, FDA may issue an order to the
applicant to cease distribution of the drug product made using the manufacturing change
until the CBE supplement is approved. 2


POLICY

       •    An applicant may continue marketing a drug product manufactured using the
            change described in a CBE supplement unless and until FDA sends the applicant
            an order to cease distribution.

       •    FDA may determine, after a drug product manufactured using a change described
            in a CBE supplement has been distributed, that the information submitted in the
            supplement fails to adequately demonstrate the continued safety and effectiveness
            of the drug product. 3 If FDA determines either that (1) there may be a danger to
            public health if the drug product continues to be marketed or (2) the drug
            product’s safety and effectiveness issues may not be resolved, FDA may order
            that the applicant cease distribution of the drug product manufactured using the
            change. 4

       •    A recommendation to issue a cease distribution order can originate from FDA’s
            assessment of the CBE supplement and may be in conjunction with FDA’s

2
    Sections 314.70(c)(7) and 601.12(c)(6).
3
    See 21 CFR parts 314 and 601.
4
    Ibid.


Originating Office: Office of Policy for Pharmaceutical Quality
Effective Date: 10/4/17                                                             Page 2 of 6

第 3 页

MANUAL OF POLICIES AND PROCEDURES

CENTER FOR DRUG EVALUATION AND RESEARCH                                                          MAPP 5001.1

          assessment of the outcome of a facility inspection or records received in lieu of a
          facility inspection.

      •   Before FDA issues a cease distribution order, the OPQ quality team members, 5
          the supervisors of these team members, the Office of Program and Regulatory
          Operations (OPRO) 6 Regulatory Business Project Manager (RBPM), and other
          FDA partners 7 relevant to that particular supplement and situation will meet
          internally to discuss whether to recommend that an order be issued to the
          applicant to cease distribution of the drug product.

      •   To document the recommendation to issue a cease distribution order, either OPQ
          staff will create a quality assessment or general assessment memorandum that
          documents the reasons why the quality team recommends that the applicant cease
          distribution of the drug product or, in the case of a facility issue, the OPRO
          RBPM and the Office of Pharmaceutical Manufacturing Assessment (OPMA)
          team member responsible for the facility assessment will capture the supporting
          information for the OPMA cease distribution recommendation and the agreements
          reached in meeting minutes. These meeting minutes will (1) serve as the official
          record for the OPMA recommendation to cease distribution and (2) be prepared
          by the OPRO RBPM with assistance from the OPQ quality team members, as
          needed.

      •   The quality assessment and recommendation should be signed by the appropriate
          signatory authorities following the accepted practices of the suboffice of the OPQ
          quality team member.
      •   If issuance of a cease distribution order has the potential to create a drug shortage,
          OPQ will follow MAPP 4190.1 Drug Shortage Management. 8

      •   If FDA issues a cease distribution order for a CBE supplement, FDA will include
          the following statement in the order: “Pursuant to 21 CFR 314.70(c)(7) (for
          drugs) or 21 CFR 601.12(c)(6) (for biologics), products manufactured with the

5
For this MAPP, the OPQ quality team includes a product quality, drug substance, drug product, process,
microbiology, facility, and biopharmaceutical assessor.
6
    OPRO is a suboffice of OPQ.
7
  These partners include, among others, the OPQ Drug Shortage Coordinator, OND, OGD, the OGD Drug
Shortage Coordinator, the CDER Drug Shortage Staff, and the Office of Compliance. In addition, the
Office of Manufacturing Quality in the Office of Compliance is a partner for a manufacturing facility that
either has a Potential Official Action Indicated or an Official Action Indicated alert associated with it or is
related to an ongoing Office of Manufacturing Quality case.
8
We update MAPPs periodically. To make sure you have the most recent version of a MAPP, check the
Manual of Policies & Procedures (CDER) web page at https://www.fda.gov/about-fda/center-drug-
evaluation-and-research-cder/cder-manual-policies-procedures-mapp.




Originating Office: Office of Policy for Pharmaceutical Quality
Effective Date: 10/4/17                                                                              Page 3 of 6

第 4 页

MANUAL OF POLICIES AND PROCEDURES

CENTER FOR DRUG EVALUATION AND RESEARCH                                         MAPP 5001.1

           changes proposed in this supplement can no longer be distributed until this CBE
           supplement is approved.”

       •   If FDA receives pertinent information to address a concern about the product
           potentially posing a danger to public health, FDA may reconsider its cease
           distribution order, document the decision internally, and communicate
           accordingly with the applicant.


RESPONSIBILITIES

       •   The OPQ Quality Team

           When conducting quality assessments of CBE supplements, the OPQ quality team
           members will follow the accepted practices of their suboffice.

       •   The OPRO RBPM Staff

           - If the OPQ quality team has identified a potential danger to public health
             related to a proposed change described in a CBE supplement, the OPRO
             RBPM staff will convene a meeting with their supervisors, the OPQ quality
             team and their supervisors, and other relevant FDA partners 9 to discuss
             whether to recommend that a cease distribution order be issued for the drug
             product.

           - The OPRO RBPM staff will document the outcome of the internal meeting
             mentioned above. If OPMA recommends a cease distribution order, the
             meeting minutes, which will be written by the OPRO RBPM and the OPMA
             team member responsible for the facility assessment, will serve as the official
             record for the OPMA facility recommendation.


PROCEDURES

       1. The OPQ quality team will perform the quality assessment of the CBE
          supplement according to the accepted practices of the team’s suboffice.

       2. If an OPQ quality team member recommends a cease distribution order, he or she
          will:

           2.1. Notify the other members of the quality assessment team and the OPRO
                RBPM of the recommendation to issue a cease distribution order.


9
    See footnote 7.


Originating Office: Office of Policy for Pharmaceutical Quality
Effective Date: 10/4/17                                                             Page 4 of 6

第 5 页

MANUAL OF POLICIES AND PROCEDURES

CENTER FOR DRUG EVALUATION AND RESEARCH                                         MAPP 5001.1

        2.2. Discuss — with his or her team members, his or her Division Director, the
             Secondary Quality Assessor, and the OPQ supervisor, as applicable — any
             product quality issues that may pose a danger to public health if the
             proposed change is implemented.

    3. The OPRO RBPM will:

        3.1. Notify the OPQ Drug Shortage Coordinator of the recommendation to issue
             a cease distribution order and initiate a meeting with the quality team
             members, the supervisors of the quality team members, and the appropriate
             partners.

        3.2. Coordinate with the OPQ Drug Shortage Coordinator, as necessary, to
             identify the appropriate partners to contact and to schedule the meeting.

        3.3. Invite the relevant OPQ assessment divisions and the OPQ Drug Shortage
             Coordinator as required attendees.

        3.4. Alert the identified non-OPQ partners (e.g., the Office of Compliance,
             relevant OND division(s), OGD, the OGD Drug Shortage Coordinator, and
             the CDER Drug Shortage Staff (DSS) about this meeting, and each of these
             offices will determine if any of its representatives should participate in the
             meeting.

    4. The partners will meet to discuss and decide the course of action for the cease
       distribution recommendation. The OPRO RBPM — or, in the case of an
       inspectional issue, the OPRO RBPM and the OPMA team member — will
       document the meeting minutes.

    5. The quality assessment or quality recommendations (in a general assessment
       memorandum) will include a justification for the recommendation to issue a cease
       distribution order and be signed by the appropriate signatory authorities following
       the accepted practices of the quality team member’s suboffice.

    6. If the recommendation to issue a cease distribution order is a result of a facility
       issue:

        6.1. The meeting minutes will serve as the official record for the OPMA facility
             recommendation and be signed by the OPMA Supervisor or designee.

        6.2. The facility assessor will document a brief summary of the OPMA facility
             recommendation in the comments section of the Overall Manufacturing
             Inspection Recommendation and will reference the meeting minutes in
             Panorama.



Originating Office: Office of Policy for Pharmaceutical Quality
Effective Date: 10/4/17                                                            Page 5 of 6

第 6 页

MANUAL OF POLICIES AND PROCEDURES

CENTER FOR DRUG EVALUATION AND RESEARCH                                        MAPP 5001.1

     7. For all CR letters for product quality supplements, the responsible OND RPM, the
        OGD RPM, or the OPQ RBPM will draft the CR letter and distribute the draft to
        the appropriate OPQ assessment staff, the OPQ Drug Shortage Coordinator, and
        involved DSS members. Subsequently, the designated signatory (the Division
        Director or designee) will assess, edit (as appropriate), and sign the letter.

     8. If a CR letter with an order to cease distribution is issued and an applicant
        responds to the deficiencies in the CR letter, FDA may find that there is sufficient
        information to lift the cease distribution order and communicate this decision to
        the applicant in the subsequent action letter.


REFERENCE


MAPP 4190.1 Drug Shortage Management


EFFECTIVE DATE

This MAPP is effective on October 4, 2017.


CHANGE CONTROL TABLE

Effective      Revision      Revisions
Date           Number
10/4/17        Initial       N/A
11/23/2022     N/A           Recertified. No Changes.
N/A            N/A           12/31/2024 Administrative revisions to align with OPQ
                             reorganization and update website address




Originating Office: Office of Policy for Pharmaceutical Quality
Effective Date: 10/4/17                                                             Page 6 of 6

来源:FDA 官方药品与生物制品信息 · fda.gov